GOLD GV Water boiler series 3 — manual
Ia Prepare boiler location — overview
Overview of this section
❏Verify the boiler installation will meet all applicable codes.
❏If the boiler installation is at high altitude (over 5,500 feet) make sure to obtain and install the high altitude kit. Obtain the high altitude kit and review the instructions included. Note the venting restrictions and input reductions at altitudes over 5,500 feet.
❏Check the boiler space to be sure minimum clearances and accessibility are available.
❏Obtain special venting materials and make sure vent will comply with instructions.
❏Direct vent installation (outside air piped to boiler) is optional in most cases. But, if air contamination is likely, you will have to pipe air to the boiler. Note list of contaminants on page 13.
❏If the GV boiler is replacing a boiler being removed from a combined vent system that will still serve other appliances, follow the procedure in this manual to verify vent performance.