Weil-McLain 550-141-850/0599, GOLD DV WATER BOILER manual Feet

Page 39

• Installation • Start-Up • Parts • Maintenance

Always use a wrench on the manifold to

Figure 17

Gas supply connection to GV

prevent it from twisting when installing or

 

boiler gas manifold

removing external gas piping. Failure to do

 

 

so could damage the blower housing

 

 

assembly, resulting in a leakage of

 

 

Service valve

(by others)

Ground joint union

(by others)

½" NPT

Blower housing cover

Manifold

Gas valve

Drip leg (by others)

Nipple length must provide at least 3 inches between the cap and tee, per ANSI Z223.1.

Outlet hex fitting

85031

Gas valve outlet hex fitting is a LEFT- HAND thread.

Gas pipe

 

Capacity of pipe for pipe size of:

 

 

Table 3

Pipe capacity for 0.60 specific

length

 

(Capacity in cubic feet gas per hour)

 

 

 

gravity natural gas

(feet)

½"

 

¾"

1"

1¼"

 

1½"

 

 

 

 

 

 

 

 

 

 

 

 

 

 

10

132

 

278

520

1050

 

1600

 

 

 

20

92

 

190

350

730

 

1100

 

 

 

30

73

 

152

285

590

 

860

 

 

 

40

63

 

130

245

500

 

760

 

 

 

50

56

 

115

215

440

 

670

 

 

 

75

45

 

93

175

360

 

545

 

 

 

100

38

 

79

150

305

 

460

 

 

 

150

31

 

64

120

250

 

380

 

 

 

Part number 550-141-850/0699

39

Image 39
Contents Gold GV How it works Gold GV Water boiler Series Please read before proceeding Hazard definitions Installer UserWhen servicing boiler Boiler operationBoiler water Contents Contents Overview of this section Ia Prepare boiler location overviewIb Prepare boiler location codes & altitude Installations must follow these codesSmall space Ic Prepare boiler location clearancesClearance options Large spaceFlooring Residential garage installationPrecautions Flooring and foundationId Prepare boiler location vent system Removing from existing ventGV special vent system Air contamination Ie Prepare boiler location contaminationIf Prepare boiler location air openings GV in small space less than alone Special considerationsIIb Prepare boiler vent starter tee & drain IIa Prepare boiler overviewScrew hole Base rail Insert Cpvc elbow Propane Plate installationIIc Prepare boiler orifice plate Natural gasBottom side of boiler front section IId Prepare boiler high altitude kit When requiredWhite Hose Red Altitudes above 5,500 feet onlyIIe Prepare boiler place in position Rotate Fill and pressure test IIf Prepare boiler pressure testPerform hydrostatic pressure test Prepare boiler for test FigPiping connections for hydrostatic test For heating system with See pages 27 30 IIIa Water piping overviewIIIb Water piping relief valve Install relief valveExpansion tank IIIc Water piping boiler connectionsSupply & return connections Air separatorPiping closed Zoning with circulators IIId Water piping all systemsBaseboard system piping IIIe Water piping baseboard systemRadiator system piping IIIf Water piping radiator systemIIIg Water piping single-zone radiant or heat pump system Outdoor reset control IIIh Water piping multi-zone radiant systemMulti-zone radiant heating system piping Manual bypass valves for fixed temp operation only IIIi Water piping snow melt systemWater chiller systems IIIj Water piping water chiller systemsIV Venting and combustion air Connecting gas supply piping to boiler Gas pipingPropane Gas Feet Thermostats VI Field wiringElectrical installation must comply with Wiring connectionsField wiring Factory wiring Verify water chemistry Freeze protection when usedVIIa Start-up overview VIIb Start-up preparationFill the system with water VIIb Start-up preparationVerify gas/air orifice plate Check for gas leaksStart the boiler VIIc Start-up read SectionVIId Start-up to operate boiler Perform final checks before starting boilerVIIe Start-up if boiler doesn’t start VIId Start-up operate boilerConnect and adjust manometer VIIf Start-up altitude over 5,500 feet onlyCheck Gas Control Set Point At Least Inches Check-out procedure checklist VIIIa Check-out procedure overviewVIIIb Check-out procedure checklist IXa Operation overview Shows the ladder wiring diagram for the GV series 3 boilerSteps IXb Operation sequenceLadder diagram legend IXb Operation wiring diagramsGCM IXc Operation lighting instructions For Your Safety Read Before OperatingWhite-Rodgers gas valve model 36E Xa Service and maintenance overview Service technician Xb Service and maintenance scheduleAnnual start-up only by qualified service technician Xc Service & maintenance annual start-upStart-up Annual start-up check/test Xc Service & maint. annual start-upcontExpansion tank GaugesIgniter Annual start-up owner review Boiler relief valveReview with owner Condensate drain line Check valve assembly To remove the blower assembly Igniter XIa Troubleshooting overview XIb Troubleshooting procedures Before troubleshootingCheck the following Checking the air pressure switch XIc Troubleshooting air pressure switchGas Valve XId Troubleshooting servicing tipsBlower Housing IgniterControl Module XIe Troubleshooting control modulePower Symptom Common Causes Possible Corrections XIf Troubleshooting common problemsSymptom Common Causes Possible Corrections Chart 1 Troubleshooting Power light status XIg Troubleshooting GCM lightsChart 2 Tstat Circ & Power lights flashing Chart 3 Limit & Power lights flashing Chart 4 Pres Switch & Power lights flashing Chart 5 Flame & Power lights flashing Chart 6 Tstat Circ light flashing and Power light on steady Chart 7 Limit light flashing and Power light on steady Is thermostat circuit closed continuity across wires? XIIa Replacement parts overview Water trim bag assembly #1 XIIb Replacement parts accessory bagDescription Model Weil-McLain Number Part number XIIc Replacement parts section assembly85041 422-200-228 XIId Replacement parts jacket assembly85042 382-200-340 XIIe Replacement parts Blower assemblyVent starter tee not included Description Weil-McLain Number Part number XIIf Replacement parts trim assembly85048 XIIg Replacement parts interior panel Interior panel Number Xiii Dimensions and ratingsDOE Gold GV Water boiler Series