GOLD GV Water boiler series 3 — manual
Xc Service & maint. — annual start-up (cont.)
Annual start-up — check/test
Boiler relief valve | Figure 30 Relief valve |
1.Inspect the relief valve and lift the lever to verify flow as in the following warnings, excerpted from a relief valve manufacturer’s warning label. Before operating any relief valve, ensure that it is piped with its discharge in a safe area to avoid severe scald potential. Read manual Section IIIb before proceeding further.
Safety relief valves should be reinspected AT LEAST ONCE EVERY THREE YEARS, by a licensed plumbing contractor or authorized inspection agency, to ensure that the product has not been affected by corrosive water conditions and to ensure that the valve and discharge line have not been altered or tampered with illegally. Certain naturally occurring conditions may corrode the valve or 85035 its components over time, rendering
the valve inoperative. Such conditions are not detectable unless the valve and its components are
physically removed and inspected. This inspection must only be conducted by a plumbing contractor or authorized inspection agency — not by the owner. Failure to reinspect the boiler relief valve as directed could result in unsafe pressure
Following installation, the valve lever must be operated AT LEAST ONCE A YEAR to ensure that waterways are clear. Certain naturally occurring mineral deposits may adhere to the valve, rendering it inoperative. When manually operating the lever, water will discharge and precautions must be taken to avoid contact with hot water and to avoid water damage. Before operating lever, check to see that a discharge line is connected to this valve directing the flow of hot water from the valve to a proper place of disposal otherwise severe personal injury may result.
If no water flows, valve is inoperative. Shut down boiler until a new relief valve has been installed.
2.After following the above warning directions, if the relief valve weeps or will not seat properly, replace the relief valve. Ensure that the reason for relief valve weeping is the valve and not
Annual start-up — owner review
Review with owner
1.Review the User’s information manual with the owner.
2.Emphasize the need to perform the maintenance schedule specified in the User’s information manual.
3.Remind the owner of the need to call in a licensed contractor should the boiler or system exhibit any abnormal behavior.
4.Remind the owner to follow the proper shutdown procedure and to schedule an anuual
62 | Part number |