Weil-McLain GOLD DV WATER BOILER, 550-141-850/0599 manual Chart 3 Limit & Power lights flashing

Page 76

GOLD GV Water boiler series 3 — manual

XIg Troubleshooting — GCM lights (continued)

CHART 3 LIMIT & POWER lights flashing

Electrical shock hazard — Wherever you see TURN OFF POWER, follow the instructions. Failure to follow instructions could result in severe personl injury, death or substantial property damage.

This is a lockout condition. The return water temperature sensor has signaled a temperature higher than 240 ˚F, but the boiler limit circuit is closed (indicating that the limit

control circuit did not catch the over-temperature condition). This is probably an indication of a failure of the boiler limit control and possibly the block temperature switch as well.

TURN OFF POWERto boiler at 120 VAC service switch.

Remove CONTROL CIRCUIT plug from control module receptacle (Figure 34, Item 5).

Remove a wire from one of the limit control spade connectors.

Connect an ohmmeter across the left and right pins on the center row of the limit circuit harness.

Does the ohmmeter indicate a shorted wire harness (zero ohms)?

Yes

No

Replace control wiring harness.

Retest.

Replace water temp sensor.

Retest.

Reconnect CONTROL CIRCUIT plug to control module.

Remove WATER TEMP SENSOR plug from control module receptacle (Figure 34, Item 6).

Connector an ohmmeter across the plug pins to check the sensor resistance.

Does the ohmmeter indicate a shorted sensor (zero ohms)?

Yes

 

No

 

 

 

 

 

 

 

 

 

Is boiler hot?

 

 

 

 

Yes

 

No

 

 

 

 

Close the external manual gas valve.

Remove one wire from the limit control space connector.

Set a thermostat to call for heat. Then turn on power to the boiler at the 120 VAC service switch.

The boiler system circulator should come on and the control module should try to cycle the boiler.

Allow the boiler circulator to run to cool off boiler and system water.

After the boiler and system water have cooled, turn off power at the 120 VAC service switch and open the external manual gas valve.

Set limit control knob to its minimum setting. Replace wire to limit control spade connector.

Set a thermostat to call for heat.

Turn on power at 120 VAC service switch.

Control module should cycle boiler on and begin heating. • The limit control should shut off the gas valve when the

temperature at the boiler pressure/temperature gauge has reached no more than about 20 ˚F higher than the limit switch setting.

Does limit control shut off gas correctly?

 

 

Yes

 

 

No

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Replace control

 

 

Replace limit control

 

 

 

 

 

and block tempera-

 

 

 

module.

 

 

 

 

 

 

 

 

 

ture switch.

 

 

Retest.

 

 

 

 

 

 

 

Retest.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

76

Part number 550-141-850/0699

Image 76
Contents Gold GV How it works Gold GV Water boiler Series Hazard definitions Installer User Please read before proceedingBoiler operation When servicing boilerBoiler water Contents Contents Ia Prepare boiler location overview Overview of this sectionInstallations must follow these codes Ib Prepare boiler location codes & altitudeIc Prepare boiler location clearances Clearance optionsLarge space Small spaceResidential garage installation PrecautionsFlooring and foundation FlooringRemoving from existing vent Id Prepare boiler location vent systemGV special vent system Ie Prepare boiler location contamination Air contaminationIf Prepare boiler location air openings Special considerations GV in small space less than aloneIIa Prepare boiler overview IIb Prepare boiler vent starter tee & drainScrew hole Base rail Insert Cpvc elbow Plate installation IIc Prepare boiler orifice plateNatural gas PropaneBottom side of boiler front section When required IId Prepare boiler high altitude kitAltitudes above 5,500 feet only White Hose RedIIe Prepare boiler place in position Rotate IIf Prepare boiler pressure test Perform hydrostatic pressure testPrepare boiler for test Fig Fill and pressure testPiping connections for hydrostatic test IIIa Water piping overview For heating system with See pages 27 30Install relief valve IIIb Water piping relief valveIIIc Water piping boiler connections Supply & return connectionsAir separator Expansion tankPiping closed IIId Water piping all systems Zoning with circulatorsIIIe Water piping baseboard system Baseboard system pipingIIIf Water piping radiator system Radiator system pipingIIIg Water piping single-zone radiant or heat pump system IIIh Water piping multi-zone radiant system Outdoor reset controlMulti-zone radiant heating system piping IIIi Water piping snow melt system Manual bypass valves for fixed temp operation onlyIIIj Water piping water chiller systems Water chiller systemsIV Venting and combustion air Gas piping Connecting gas supply piping to boilerPropane Gas Feet VI Field wiring Electrical installation must comply withWiring connections ThermostatsField wiring Factory wiring Freeze protection when used VIIa Start-up overviewVIIb Start-up preparation Verify water chemistryVIIb Start-up preparation Verify gas/air orifice plateCheck for gas leaks Fill the system with waterVIIc Start-up read Section VIId Start-up to operate boilerPerform final checks before starting boiler Start the boilerVIId Start-up operate boiler VIIe Start-up if boiler doesn’t startVIIf Start-up altitude over 5,500 feet only Connect and adjust manometerCheck Gas Control Set Point At Least Inches VIIIa Check-out procedure overview Check-out procedure checklistVIIIb Check-out procedure checklist Shows the ladder wiring diagram for the GV series 3 boiler IXa Operation overviewIXb Operation sequence StepsIXb Operation wiring diagrams Ladder diagram legendGCM For Your Safety Read Before Operating IXc Operation lighting instructionsWhite-Rodgers gas valve model 36E Xa Service and maintenance overview Xb Service and maintenance schedule Service technicianXc Service & maintenance annual start-up Annual start-up only by qualified service technicianStart-up Xc Service & maint. annual start-upcont Annual start-up check/testGauges Expansion tankIgniter Boiler relief valve Annual start-up owner reviewReview with owner Condensate drain line Check valve assembly To remove the blower assembly Igniter XIa Troubleshooting overview Before troubleshooting XIb Troubleshooting proceduresCheck the following XIc Troubleshooting air pressure switch Checking the air pressure switchXId Troubleshooting servicing tips Blower HousingIgniter Gas ValveXIe Troubleshooting control module Control ModulePower XIf Troubleshooting common problems Symptom Common Causes Possible CorrectionsSymptom Common Causes Possible Corrections XIg Troubleshooting GCM lights Chart 1 Troubleshooting Power light statusChart 2 Tstat Circ & Power lights flashing Chart 3 Limit & Power lights flashing Chart 4 Pres Switch & Power lights flashing Chart 5 Flame & Power lights flashing Chart 6 Tstat Circ light flashing and Power light on steady Chart 7 Limit light flashing and Power light on steady Is thermostat circuit closed continuity across wires? XIIa Replacement parts overview XIIb Replacement parts accessory bag Water trim bag assembly #1XIIc Replacement parts section assembly Description Model Weil-McLain Number Part number85041 XIId Replacement parts jacket assembly 422-200-22885042 XIIe Replacement parts Blower assembly 382-200-340Vent starter tee not included XIIf Replacement parts trim assembly Description Weil-McLain Number Part number85048 XIIg Replacement parts interior panel Interior panel Xiii Dimensions and ratings NumberDOE Gold GV Water boiler Series