Overview of this section
❏Select suggested piping from the following table, based on the type of system in which you are installing the GV boiler.
❏Review boiler connections, pages 28 – 29 — information on supply and return connections at boiler and key system components (air separator and expansion tank).
❏Review page 30, information applying to all systems.
❏Obtain any system components needed but not on hand or available at jobsite.
❏Install boiler relief valve and pipe discharge to a safe location per guidelines in this section.
❏Install system piping and boiler connections.
❏Install additional limit control (if required for code compliance) and low
water cutoff if required.
| For heating system with . . . | See pages 27 – 30 and . . . |
| |
|
|
|
| |
| Baseboard, finned tube or cast iron | 31 |
| |
|
|
|
|
|
| Radiators, cast iron |
| 32 |
|
|
|
|
|
|
| Radiant floor, wall or ceiling — | single zone (note 1) | 33 |
|
|
|
|
|
|
| Radiant floor, wall or ceiling — | multiple zones | 34 |
|
|
|
|
|
|
| Heat pump (note 1) |
| 33 |
|
|
|
|
|
|
| Snow melt plus space heating |
| 35 |
|
|
|
|
|
|
| Control valve (note 2) |
| 34 |
|
|
|
|
|
|
| Water chiller |
| 36 |
|
|
|
|
| |
| Note 1: Install a temperature limit control in the supply piping to protect the system. |
| ||
| Note 2: Apply these piping designs for outdoor reset or any system requiring automatic |
| ||
| supply temperature regulation. |
|
| |
|
|
|
|
|