CENTER OF HOLE
CENTER LINE
WALL | CENTER LINE |
THIMBLE |
|
Figure 5.5
5.Installation requires a minimum of 6 in. (152 mm) horizontal run of vent with a 1/4 in. (6 mm) rise run towards the termination. Each 1 ft. (305 mm) of horizontal venting must include a 1/4 in. (6 mm) rise. Never allow the vent to run downward. This could cause high temperatures and may present the possibility of a fire. The location of the horizontal vent termination on an exterior wall must meet all local and national building codes, and must not be easily blocked or obstructed, see Figure 4.4 on page 10.
6.For installations requiring a vertical rise on the exterior of the building, the HHT RHVK snorkel kit (Part #844- 8921) is available with a 14 in. (356 mm) and a 36 in. (914 mm) tall snorkel termination cap. Follow the same installation procedures as used for standard horizontal terminations. If the snorkel termination must be installed below grade (i.e. basement application), proper drainage must be provided to prevent water from entering the snorkel termination. Do not backfill around snorkel termination.
7.Position the horizontal termination cap in the center of the 10 in. x 10 in. (254 mm x 254 mm) square hole and run a bead of
WOOD
SCREW
PART HHW2
HOT (PREFERRED)
WALL THIMBLE
Figure 5.6
8.The four wood screws provided should be replaced with appropriate fasteners for stucco, brick, concrete, or other types of sidings.
9.Termination cap HHW2 (Part
8 in. | 7 in. |
(203 mm) | (178 mm) |
7 in. | 6 in. |
(178 mm) | (152 mm) |
Figure 5.7
10.If you are installing termination cap HHW2, the pipe will be off center on flashing). Ensure that proper clearances to combustible materials are maintained. If you are using an approved termination cap other than HHW2 (part
14 | Heat & Glo • Paloma • |