Hearth and Home Technologies PALOMA-GR, PALOMA-BL, PALOMA-BZ, PALOMA-GY Vertical Termination

Page 16

G. Vertical Termination

VERTICAL TERMINATION

CAP USE PART #SLK-991DA

STORM COLLAR

FLASHING

FIRESTOP

SUPPORT BOX

PIPE LENGTH

On vertical terminations use only Part #SLK-991DA or like components. See page 55.

Figure 5.10

1.Check the installation instructions for required 1 in. (25 mm) clearances (air space) to combustibles when passing through ceilings, walls, roofs, enclosures, attic rafters, or other nearby combustible surfaces. See page 16, Figure 5.15. Check the instructions for maximum vertical rise of the venting system, and any maximum horizontal offset limitations. All offsets must fall within the set parameters of the vent graph (Figure 5.2) located on page 12.

Note: Maximum vertical rise allowable is 40 ft. (10.7 m), Figure 5.11. Maximum number of 45º elbows permitted for a vertical installation is eight, provided their installation does not decrease maximum allowable horizontal run (as specified by vent graph, on page 12).

WARNING

Fire Risk. Explosion Risk.

Maintain vent clearance to combustibles as specified.

Do not pack air space with insulation or other materials.

Failure to keep insulation or other materials away from vent pipe may cause fire.

40 ft. (12 m)

MAXIMUM

Figure 5.11

2.Set the gas appliance in its desired location. Drop a plumb bob down from the ceiling to the position of the appliance flue exit, and mark the location where the vent will penetrate the ceiling. Drill a small hole at this point. Next, drop a plumb bob from the roof to the hole previously drilled in the ceiling, and mark the spot where the vent will penetrate the roof. Determine if ceiling joists, roof rafters, or other framing will obstruct the venting system. You may wish to relocate the appliance, or to offset, as shown in Figure 5.12 to avoid cutting load bearing members.

PLUMBER'S TAPE

CONNECTED TO

WALL STRAP

WALL

STRAP

TWO 45º

ELBOWS

Figure 5.12

16

Heat & Glo • Paloma • 7031-220 Rev. P • 10/08

Image 16
Contents Models What to do if you smell gasDo Discardnot Hot glass will cause burnsCongratulations Homeowner Reference InformationTable of Contents Listing and Code Approvals Installation of Carbon Monoxide Detectors Requirements for the Commonwealth of MassachusettsGetting Started Installation to ensure maximum safety and benefitTools and Supplies Needed Framing and Clearances Selecting Appliance LocationClearances to Combustibles ModelOptional Stone Surround Installed Paloma SurroundVent Termination Minimum Clearances Termination LocationsSee .4 for specific clearances Alcove Applications Vent Information Venting ComponentsUse of Elbows Measuring StandardsHow to Use the Vent Graph SNKD, Horizontal InstallationVenting Guidelines Exception for Rear Vent KIT Snorkel Kit SLK Horizontal Termination Female Locking Lugs Male Locking203 mm 178 mm 152 mm Vinyl Siding Vertical Termination Hole as shown in Figure Twist-lock the vent cap and seal Cathedral Ceiling Class a Metal Chimney Existing Masonry Chimney Type aTo determine the length of flex needed, measure from Flex Liner Flex Coupler Sheet Metal Screws Slim Line Wall Thimble Installing Slim Line Trim Ring and Heat ShieldAssembling Slim Line Trim Ring and Heat Shield FIG. C Minimum Clearance Procedure for Conversion Gas InformationFuel Conversions Converting to LP GasReattach Pilot Shield Verify the performance of the ignition system Gas PressuresPressure Natural Gas Propane Gas Connection Check for GAS LeaksRecommendation for Wire Connecting to the ApplianceIntelliFire Ignition System Wiring Wire Size Max. LengthLoss of Power and Battery Backup Usage Wall Switch Installation for Fan Optional Junction Box Wired to Wall SwitchRemove Shipping Materials Appliance SetupUnbolting Appliance from the Pallet Accessories Leveling and Lagging Down the ApplianceTop to Rear Vent Conversion Shutter Adjustment Installing the Vent RestrictorInstalling the Baffle Positioning the LogsMineral Wool Installation precautionsOptional Blower Black Wires Recommended operating procedures Variable Installing flame control solenoid Remote ControlsRemote receiver Wiring the flame control solenoid RED Orange BlueFront Door Glass Assembly Installation Inner Glass Door Assembly ReplacementBefore Lighting Appliance Operating InstructionsControls Turn off all electric power to the appliance On position. The ON/OFF switch mayLighting Appliance IPI Ignition Final inspection byInitial Break-in Procedure Frequently Asked QuestionsAfter Appliance is Lit Symptom Possible Cause Corrective Action TroubleshootingIntellifire Ignition System flame has been lit, flame Maintaining and Servicing Appliance Maintenance Tasks Inspect Maintenance TasksAppliance Dimension Diagram Without Stone Surround Reference MaterialsHearth Pad Location Inches MillimeterAppliance Dimension Diagram With Stone Surround Appliance Dimensions with Stone SurroundVent Components Diagram SLP Series Vent ComponentsVent Components List MiscellaneousLog Set Assembly Service PartsService Parts List StockedAt Depot Description Comments Part NumberStocked Bottom Plate Assembly PalomaCONDITIONS, Exclusions & Limitation of Liability Limited Lifetime Warranty Contact Information