Hearth and Home Technologies PALOMA-BL Termination Locations, Vent Termination Minimum Clearances

Page 9

4 Termination Locations

A. Vent Termination Minimum Clearances

HORIZONTAL OVERHANG

WARNING

Fire Risk. Explosion Risk.

Maintain vent clearance to combustibles as specified.

Do not pack air space with insulation or other materials.

Failure to keep insulation or other materials away from vent pipe may cause fire.

2FT.

MIN.

GAS DIRECT VENT

TERMINATION CAP

20 INCHES MIN.

VERTICAL

LOWEST

WALL

 

DISCHARGE

 

OPENING

 

X

12

ROOF PITCH

IS X/ 12

H (MIN.) - MINIMUM HEIGHT FROM ROOF TO LOWEST DISCHARGE OPENING

Measure vertical clearances from this surface.

Measure horizontal clearances from this surface.

(See Figure 4.4 for specific clearances)

Figure 4.1

Roof Pitch

H (Min.) Ft.

Flat to 6/12

1.0*

Over 6/12 to 7/12

1.25*

Over 7/12 to 8/12

1.5*

Over 8/12 to 9/12

2.0*

Over 9/12 to 10/12

2.5

Over 10/12 to 11/12

3.25

Over 11/12 to 12/12

4.0

Over 12/12 to 14/12

5.0

Over 14/12 to 16/12

6.0

Over 16/12 to 18/12

7.0

Over 18/12 to 20/12

7.5

Over 20/12 to 21/12

8.0

* 3 foot minimum in snow regions

Figure 4.2 Minimum height from roof to lowest discharge opening

Figure 4.2 specifies minimum vent heights for various pitched roofs.

GAS, WOOD OR FUEL

 

OIL TERMINATION

B

 

GAS

CTERMINATION

A

 

Gas

Wood & Fuel Oil

Comments

 

Termination

Termination

 

 

A

6 in.

20 in. min.

Horizontal distance between terminations

B

20 in.

24 in. min.

Distance to perpendicular wall

C

18 in.

18 in.

Vertical distance between terminations

Figure 4.3 Multiple Vertical Termination

Heat & Glo • Paloma • 7031-220 Rev. P • 10/08

9

Image 9
Contents What to do if you smell gas ModelsDo Discardnot Hot glass will cause burnsHomeowner Reference Information CongratulationsTable of Contents Listing and Code Approvals Requirements for the Commonwealth of Massachusetts Installation of Carbon Monoxide DetectorsInstallation to ensure maximum safety and benefit Getting StartedTools and Supplies Needed Selecting Appliance Location Framing and ClearancesClearances to Combustibles ModelPaloma Surround Optional Stone Surround InstalledTermination Locations Vent Termination Minimum ClearancesSee .4 for specific clearances Alcove Applications Venting Components Vent InformationUse of Elbows Measuring StandardsSNKD, Horizontal Installation How to Use the Vent GraphVenting Guidelines Exception for Rear Vent KIT Snorkel Kit SLKFemale Locking Lugs Male Locking Horizontal Termination203 mm 178 mm 152 mm Vinyl Siding Vertical Termination Hole as shown in Figure Twist-lock the vent cap and seal Cathedral Ceiling Class a Metal Chimney Type a Existing Masonry ChimneyTo determine the length of flex needed, measure from Flex Liner Flex Coupler Sheet Metal Screws Installing Slim Line Trim Ring and Heat Shield Slim Line Wall ThimbleAssembling Slim Line Trim Ring and Heat Shield FIG. C Minimum Clearance Gas Information Procedure for ConversionFuel Conversions Converting to LP GasReattach Pilot Shield Gas Pressures Verify the performance of the ignition systemPressure Natural Gas Propane Check for GAS Leaks Gas ConnectionConnecting to the Appliance Recommendation for WireIntelliFire Ignition System Wiring Wire Size Max. LengthLoss of Power and Battery Backup Usage Junction Box Wired to Wall Switch Wall Switch Installation for Fan OptionalAppliance Setup Remove Shipping MaterialsUnbolting Appliance from the Pallet Leveling and Lagging Down the Appliance AccessoriesTop to Rear Vent Conversion Installing the Vent Restrictor Shutter AdjustmentPositioning the Logs Installing the BaffleInstallation precautions Mineral WoolOptional Blower Black Wires Recommended operating procedures Variable Remote Controls Installing flame control solenoidRemote receiver RED Orange Blue Wiring the flame control solenoidInner Glass Door Assembly Replacement Front Door Glass Assembly InstallationOperating Instructions Before Lighting ApplianceControls On position. The ON/OFF switch may Turn off all electric power to the applianceLighting Appliance IPI Ignition Final inspection byFrequently Asked Questions Initial Break-in ProcedureAfter Appliance is Lit Troubleshooting Symptom Possible Cause Corrective ActionIntellifire Ignition System flame has been lit, flame Maintaining and Servicing Appliance Inspect Maintenance Tasks Maintenance TasksReference Materials Appliance Dimension Diagram Without Stone SurroundHearth Pad Location Inches MillimeterAppliance Dimensions with Stone Surround Appliance Dimension Diagram With Stone SurroundSLP Series Vent Components Vent Components DiagramMiscellaneous Vent Components ListService Parts Log Set AssemblyStocked Service Parts ListAt Depot Description Comments Part NumberStocked Paloma Bottom Plate AssemblyCONDITIONS, Exclusions & Limitation of Liability Limited Lifetime Warranty Contact Information