Bradford-White Corp CX), PDX75S70F(B, C)*(N, PDX65S65F(B warranty Dip Tube Inspection and Replacement

Page 32

PDX Series

PDX SERVICE PROCEDURE X

Dip Tube

Inspection and replacement

Dip Tube Inspection and Replacement

WARNING

Water Heater components and stored water may be HOT when performing the following

steps in this procedure. Take necessary precaution to prevent personal injury.

Step 1. Position on/off switch of gas control valve to “OFF” position and unplug water heater from wall outlet.

Step 2. Turn off cold water supply to water heater. Connect hose to drain valve of water heater and route to an open drain. Open a nearby hot water faucet to vent heater for draining. Open drain valve of water heater and allow heater to drain to a point below the inlet connection nipple.

Step 3. Disconnect inlet nipple from plumbing system.

Step 4 With an appropriate tool such as a pipe wrench, remove inlet nipple/dip tube from the water heater. Use caution not to damage pipe threads.

Step 5. Visually inspect inlet nipple/dip tube. Inlet nipple/dip tube should be free of cracks and any blockage. Hydro-jet slots should be open and free of any blockage.

Any damage such as cracks, restriction due to deformation or unintentional holes are not field repairable and the inlet nipple/dip tube must be replaced.

Step 6. Upon completion of inspection or subsequent replacement, reinstall inlet nipple/dip tube into water heater. Connect nipple to plumbing system, resume water supply and refill with water.

Step 7. To resume operation follow the instructions located on the lighting instruction label or the lighting instructions located in the installation and operation manual.

Page 32

32

Image 32
Contents Service Manual Denotes Warranty YearsTable of Contents PDX Series Introduction Tools Required for Service How to Use This ManualSpecifications PDX Series Control Timings Power up Sequence Sequence of OperationAbnormal Operation Pressure Switch/Blower Temperature Fault Troubleshooting Probable Cause Service Status ProcedureGreen LED Indicator LED StatusTroubleshooting LED Status Air Shutter Nut Burner Inspection and Air Shutter AdjustmentCast Iron Burner Air Shutter Adjustment Burner Cleaning Burner Surface area Feedline nut Pilot tubing nut Port areaPilot Inspection, Testing and Replacement Igniter/flame Sense wireFeedline nut Pilot tubing nut Ferrule OrificeMaking voltage checks to avoid personal injury Exhaust Pressure Switch TestingVolt potential exposure. Use caution Exhaust Pressure Switch Replacement Slide pressure switch in directionFrom blower housing To avoid personal injuryInlet Pressure Switch Switch for blockage Is there blockage?To call for heat, this will start the blower SeeInlet Pressure Switch Replacement Remove screwsBlower Testing Volt potential exposure. Use caution whenBlower Installation Blower removalRemove exhaust Blower Cord Sets Blower Mounting ScrewsBlower Temperature Switch Testing Blower Temperature Switch Replacement If Control has gone into TCO lockout due to Gas Control TestingThermal Well Testing Determine Water Temperature Inside Tank Sensor Resistance at Various TemperaturesGas Control & Thermal Well Removal From Water Heater Gas Control Removal From Thermal WellGas Control Assembly to Thermal Well Flammable Vapor Device Testing Safety Circuit Voltage Trace Wires as shown Control VAC Circuit TraceShown in photo Across black & white YDip Tube Inspection and Replacement Anode Inspection and Replacement Flue baffle Inner Door Removal Procedure Installation of Inner Door With Gasket Installation of inner door with gasket from Glossary of Terms Parts List Parts@bradfordwhite.com Techserv@bradfordwhite.com
Related manuals
Manual 28 pages 24.42 Kb