Bradford-White Corp PDX50S60F(B, PDX75S70F(B, CX), C)*(N, PDX65S65F(B, PDX275T6*F(BN PDX Series

Page 7
Vent Tables

PDX Series

Specifications

Venting Specifications for:

48Gallon

65Gallon

75Gallon

This water heater is approved for installation with the following PVC, CPVC or ABS Schedule 40 venting material.

The maximum and minimum vent lengths listed on this label are for the exhaust portion of the vent. The intake portion of the vent must be equal to or less than the length of the exhaust.

3" Diameter (7.6 cm) PVC Vent Connector Lengths

 

# of

Maximum 48, 65 gal.

 

Maximum 75 gal.

Terminating

Maximum

Minimum

Maximum

Minimum

Elbows

 

Length ft (m)

Length ft (m)

Length ft (m)

Length ft (m)

 

 

 

 

 

 

 

 

 

Through the Wall

1

55 (16.8)

2

(.6)

45

(13.7)

2

(.6)

 

 

 

 

 

 

 

 

 

Through the Wall

2

50 (15.2)

2

(.6)

40

(12.2)

2

(.6)

Through the Wall

3

45 (13.7)

2

(.6)

35

(10.7)

2

(.6)

 

 

 

 

 

 

 

 

Through the Wall

4

40 (12.2)

2

(.6)

30 (9.1)

2

(.6)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Through the Roof

0

60 (18.3)

7 (2.1)

50

(15.2)

7 (2.1)

 

 

 

 

 

 

 

Through the Roof

1

55 (16.8)

7 (2.1)

45

(13.7)

7 (2.1)

Through the Roof

2

50 (15.2)

7 (2.1)

40

(12.2)

7 (2.1)

 

 

 

 

 

 

 

Through the Roof

3

45 (13.7)

7 (2.1)

35

(10.7)

7 (2.1)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

4" Diameter (10.2 cm) PVC Vent Connector Lengths

 

 

 

 

 

 

 

 

 

# of

Maximum 48, 65 gal.

 

Maximum 75 gal.

Terminating

Maximum

Minimum

Maximum

Minimum

Elbows

 

Length ft (m)

Length ft (m)

Length ft (m)

Length ft (m)

 

 

 

 

 

 

 

 

 

Through the Wall

1

95 (29.0)

10

(3.1)

85

(25.9)

10

(3.1)

 

 

 

 

 

 

 

 

 

Through the Wall

2

90 (27.4)

10

(3.1)

80

(24.4)

10

(3.1)

 

 

 

 

 

 

 

 

 

Through the Wall

3

85 (25.9)

10

(3.1)

75

(22.9)

10

(3.1)

Through the Wall

4

80 (24.4)

10

(3.1)

70

(21.3)

10

(3.1)

 

 

 

 

 

 

 

 

 

Through the Wall

5

75 (22.9)

12

(3.6)

65

(19.8)

12

(3.6)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Through the Roof

0

100 (30.5)

15

(4.6)

90

(27.4)

15

(4.6)

 

 

 

 

 

 

 

 

 

Through the Roof

1

95 (29.0)

15

(4.6)

85

(25.9)

15

(4.6)

 

 

 

 

 

 

 

 

 

Through the Roof

2

90 (27.4)

15

(4.6)

80

(24.4)

15

(4.6)

 

 

 

 

 

 

 

 

 

Through the Roof

3

85 (25.9)

15

(4.6)

75

(22.9)

15

(4.6)

 

 

 

 

 

 

 

 

 

Through the Roof

4

80 (24.4)

15

(4.6)

70

(21.3)

15

(4.6)

 

 

 

 

 

 

 

 

 

Page 7

7

Image 7
Contents Denotes Warranty Years Service ManualTable of Contents PDX Series Introduction How to Use This Manual Tools Required for ServiceSpecifications PDX Series Control Timings Sequence of Operation Power up SequenceAbnormal Operation Pressure Switch/Blower Temperature Fault LED Status TroubleshootingProbable Cause Service Status Procedure Green LED IndicatorTroubleshooting LED Status Cast Iron Burner Air Shutter Adjustment Burner Inspection and Air Shutter AdjustmentAir Shutter Nut Burner Surface area Feedline nut Pilot tubing nut Port area Burner CleaningOrifice Pilot Inspection, Testing and ReplacementIgniter/flame Sense wire Feedline nut Pilot tubing nut FerruleVolt potential exposure. Use caution Exhaust Pressure Switch TestingMaking voltage checks to avoid personal injury To avoid personal injury Exhaust Pressure Switch ReplacementSlide pressure switch in direction From blower housingSee Inlet Pressure SwitchSwitch for blockage Is there blockage? To call for heat, this will start the blowerRemove screws Inlet Pressure Switch ReplacementVolt potential exposure. Use caution when Blower TestingBlower Cord Sets Blower Mounting Screws Blower InstallationBlower removal Remove exhaustBlower Temperature Switch Testing Blower Temperature Switch Replacement Thermal Well Testing Gas Control TestingIf Control has gone into TCO lockout due to Sensor Resistance at Various Temperatures Determine Water Temperature Inside TankGas Control Removal From Thermal Well Gas Control & Thermal Well Removal From Water HeaterGas Control Assembly to Thermal Well Flammable Vapor Device Testing Safety Circuit Voltage Trace Across black & white Y Wires as shown ControlVAC Circuit Trace Shown in photoDip Tube Inspection and Replacement Anode Inspection and Replacement Flue baffle Inner Door Removal Procedure Installation of Inner Door With Gasket Installation of inner door with gasket from Glossary of Terms Parts List Parts@bradfordwhite.com Techserv@bradfordwhite.com
Related manuals
Manual 28 pages 24.42 Kb