3Com 500 manual Installation, Siting the AccessBuilder

Models: 500

1 124
Download 124 pages 5.49 Kb
Page 36
Image 36

1-16 CHAPTER 1: GETTING STARTED

Installation

Siting the AccessBuilder 500

When siting the AccessBuilder 500, ensure:

It is accessible and cables can be easily connected.

It is out of direct sunlight and away from sources of heat.

Cabling is away from:

Sources of electrical noise, such as radios, transmitters and broadband amplifiers.

Power lines and fluorescent lighting fixtures.

Water or moisture cannot enter the case of the unit.

Air flow around the unit and the side of the case is not restricted. We recommend that you provide a minimum of 30mm (approx. 1.25 inch) clearance around the unit.

To prolong the operational life of your equipment, do not place objects on top of the unit.

Page 36
Image 36
3Com 500 manual Installation, Siting the AccessBuilder