31
Setting up the system
Pre-installation requirements
Selecting a site
Before unpacking and installing the system, select a suitable site for the system for maximum efficiency. Consider the following factors when choosing a site for the system:
•Near a grounded power outlet
•Clean and
•Stable surface free from vibration
•
•Secluded from electromagnetic fields produced by electrical devices such as air conditioners, radio and TV transmitters, etc.
Checking the package contents
Check the following items from the package:
•Acer Altos R520 server system
•Acer EasyBUILDTM
•Acer Altos R520 accessory box
If any of the above items are damaged or missing, contact your dealer immediately.
Save the boxes and packing materials for future use.