Installation | |
|
|
INSTALLATION
Upon receipt of the equipment, inspect the contents for signs of damage. If the equipment has been damaged in transit, immediately report the extent of damage to the transportation company and to ADC.
CO shelf
Figure 2. Installing the H4TU-C-319 List 1 into a Shelf
When installing an
To comply with the intrabuilding wiring requirements of
1Align the
2Place your thumbs on the front panel and push the
8 | September 12, 2003 |