Installing the IPR-S1000

Protect the equipment

1)Never assume that electrical power is disconnected. Do check it first.

2)Do a previous check-up of any potential source of danger within your work environment (wet floor, visible electrical cable...).

3)Always disconnect AC power cable during the installation when moving the equipment.

3. Site requirements

To assure normal operation and avoid unnecessary maintenance, it is recommended to prepare your site before installation.

Planning a proper location for the IPR-S1000

1)Place the IPR-S1000 into the desired location. The unit is designed to be sitting vertically on a plane and clean surface.

2)Keep the product safe from heat, dust and moisture.

3)Make sure the site maintains an ambient temperature of 5° to 45°C.

4. Installation checklist

To assist you with your installation and to provide a historical record of what was done and by whom, fill in the following IPR-S1000 installation checklist.

Installation Checklist

Task

Verified

by

 

Date the IPR-S1000 received

The IPR-S1000 and accessories unpacked

Types and numbers of interfaces verified

Safety recommendations and guidelines reviewed

Site requirements verified

Date

4

Page 9
Image 9