Agilent Technologies E3633A, E3634A manual Preliminary Checkout

Models: E3634A E3633A

1 175
Download 175 pages 17.89 Kb
Page 28
Image 28
Preliminary Checkout

Chapter 2 Initial Operation

Preliminary Checkout

Preliminary Checkout

The following steps help you verify that the power supply is ready for use.

1Check the list of supplied items.

Verify that you have received the following items with your power supply. If anything is missing, contact your nearest Agilent Technologies Sales Office.

One power cord for your location.

This User’s Guide.

One Service Guide.

Certificate of Calibration.

2Verify the power-line voltage setting on the rear panel.

The power-line voltage is set to the proper value for your country when the power supply is shipped from the factory. Change the voltage setting if it is not correct. The settings are: 100, 115, or 230 Vac.

3Verify that the correct power-line fuse is installed.

The correct fuse is installed for your country when the power supply is shipped from the factory. For 100 or 115 Vac operation, you must use a 6.3 AT fuse. For 230 Vac operation, you must use a 3.15 AT fuse.

4Connect the power-line cord and turn on your power supply.

The front-panel display will light up and a power-on self-test occurs automatically when you turn on the power supply.

See ‘‘Power-Line Voltage Selection’’, starting on page 22 in chapter 1 if you need to change the power-line voltage or the power-line fuse.

To replace the 6.3 AT fuse, order Agilent part number 2110-1030. To replace the 3.15 AT fuse, order Agilent part number 2110-1031.

27

2

Page 28
Image 28
Agilent Technologies E3633A, E3634A manual Preliminary Checkout