34006451EN/AC - Page 20
Installation
Right cubicle of single-unit UPS

Cables connected by lugs to 100 x 8 mm copper terminals and 13 mm diameter holes.

Height of connections relative to floor:

– mains 2 and load: 430 mm;

– remote relay board: 1030 mm.

cross-section AA front view
A
A
XR7
XR6
XR5
XR9
XR8
XR4
XR2
XR1
Q4S
XR3
L1L2 L3N
L1L2 L3N
on
off
Q3BP
on
off
Q5N
on
off
inverter
stack inverter
stack
inverter
stack
spacing
uprights
cable
tie bar
air extraction
air
admission
air
admission
connection
from below
trough (if applicable)

rearfront

power cable routing via the bottom
additional remote
relay board (optional)
load
card
cage
remote relay
board
transformer
mains 2,
load
cable tie bar
card
cage
mains 2
earth
bar