Installation

Example of an installation comprising three modular UPSs with an external maintenance bypass

External

 

 

 

External maintenance bypass cubicle

 

 

 

 

 

 

 

 

 

 

 

 

maintenance

 

 

 

 

 

 

 

 

 

 

bypass line

 

 

 

 

 

Q3BP

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

modular UPS cubicle 1

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

earth

 

mains 2

 

Q4S

static

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

switch

 

 

 

 

 

 

mains 1

Q1

rectifier

inverter 1

 

Q5N

 

 

 

 

 

 

 

 

charger

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

frames interconnection for earthing

 

 

earth

battery cubicle

QF1

+

-

+

-

other battery

earth

 

beside rectifier-

 

 

 

 

 

cubicles (if

 

 

inverter cubicle 1

 

 

 

 

 

applicable)

 

 

 

modular UPS cubicle 2

 

 

 

frames interconnection for earthing

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

earth

 

mains 2

 

Q4S

static

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

switch

 

 

 

 

 

 

mains 1

Q1

rectifier

 

 

 

 

 

Q5N

Q5N

load

 

 

 

 

 

 

 

inverter 2

 

 

 

 

charger

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

frames interconnection for earthing

 

 

earth

battery cubicle

QF1

+

-

+

-

other battery

earth

 

beside rectifier-

 

 

 

 

 

cubicles (if

 

 

inverter cubicle 2

 

 

 

 

 

applicable)

 

 

 

 

 

 

 

 

frames interconnection for earthing

 

 

modular UPS cubicle 3

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

earth

 

mains 2

 

Q4S

static

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

switch

 

 

 

 

 

 

mains 1

Q1

rectifier

 

 

 

 

 

Q5N

 

 

 

inverter 3

 

 

 

 

 

charger

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

frames interconnection for earthing

 

 

earth

battery cubicle

QF1

+

-

+

-

other battery

earth

 

beside rectifier-

cubicles (if

 

 

inverter cubicle 3

 

 

 

 

 

applicable)

 

 

Fig. 15

Important. The power cables between each UPS and the upstream protection devices must be the same length. The same holds for the power cables between each UPS cubicle and the external maintenance bypass.

34006451EN/AC - Page 16