
Installation
Connections between ACPZ boards (frequency converters or parallel UPSs with SSC)
–these connections are made through the special cables supplied;
–these connections only concern installations with a Static Switch Cubicle and should be made in addition to the connections between
–the ribbon cable from connector XM133 of the ACPZ board of one
Important:
Outside the cubicles, group the APOZ
Connections between each
ACPZ board |
|
|
|
| |
| ribbon cable |
|
| supplied |
|
XM133 |
|
|
ACPZ board |
|
|
|
| |
| ribbon cable |
|
| supplied |
|
XM133 |
|
|
| ACPZ board | |
ACPZ board | of the static | |
switch cubicle | ||
| ribbon cable |
|
| supplied |
|
XM133 | XM XM XM XM | XM XM |
| 127 128 129 130 | 131 132 |
Fig. 18