5. Installing ClickShare
Image5-3
Removalof pre-mounted screws
3. Install the mounting brackets to the Base Unit as show n on image 5-2. Drive in the four removed Pan Head T10 M3 screws to
secure the brackets to the Base Unit.
4. Insert a plug in each hole (if needed anddepending on the ceiling type) and drive in the 4 moun tings crews.
Note: Mountingscrews and plugs are not included in the ClickShare box . Thetype of screws and plugs depends on the type
ofceiling (stone, wood, plasterboard, ...) you are mounting the Base Unit to.
Tip: This procedure should be performed by two people: one person holding the Base Unit in place, one person tightening
the screws.
5.5 Rack mountingAbout rack mounting
For meeting rooms with a dedicated AVrack, an optional Rack Mount for the ClickShare Base Unit is available. This integrates
ClickShareseamlessly into the room’s existing high-end AV installation. The rack mounting kit should be ordered separately.
Necessary free space in the rackis 3U.
Thetotal weight of the Base Unit — including the rack mount plate — is 6,1 kg.
Necessary tools
• TorxT10 screwdriver
• Additionalscrewdriver that matches the mounting screws
Necessary parts
• A rack mount kit(to be ordered separately)
• 4 screws (included inthe rack mount kit)
How to install
1. Remove the four Pan H ead T10 M3 screws at the bottom of the Base Unit.
R5900006 CLICKSHARE 04/12/2013 27