7. ASSEMBLY

7-4. Zigzag mechanism

1.

Needle bar base

8.

Wick

 

(With needle bar base guide pin inserted)

 

(Pull in oil tank.)

2.

Needle bar base guide R

9.

Wick (ring)

3.

Set screw

 

(Pass the shaft through the ring.)

4.

Needle bar base guide pin

10.

Zigzag joint (Pass the shaft through.)

5.

Set screw

11.

Bolt (Temporarily tighten)

6.

Pulse motor assembly

12.

Screw

7.

Bolts [3 pcs]

13.

Screw

Pass the harness of the pulse motor encoder detection unit through.

After carrying out the assembly operations in “7-5. Needle bar mechanism”, tighten while carrying out the adjustments in “9-12. Needle zigzag sideways position”.Then carry out the adjustments in “9-11. Needle zigzag forward/back position”.

 

0122B

After pushing in needle bar base guide R, check that

 

there is no play between the needle bar base guide pin

If there is a lot of looseness in the wick

and needle bar base guides R and F, and also that the

(ring) after installing, pull only the wick

needle moves smoothly when it zigzags.

shown in the illustration through the oil tube

 

 

to adjust.

14. Knee lifter bar

15. Screw

0123B

Z-8550A, 8560A

58