Cabletron Systems SEHI-32, SEHI-22, SEHI-24 On Position Toward Back Epim OFF Position Toward Front

Models: SEHI-24 SEHI-32 SEHI-34 SEHI-22

1 93
Download 93 pages 315 b
Page 53
Image 53

CONNECTING TO THE NETWORK

ON Position

 

ON

(Toward Back

 

of EPIM)

 

OFF Position

(Toward Front

of EPIM)

OFF

Figure 4-7. The EPIM-X

4.2FINISHING THE INSTALLATION

The SEHI is now ready for operation. Before placing the network into service, test the installation thoroughly, making sure that you can address all stations and that the SEHI and all stations are indicating normal operation. Ensure that the networking software is configured properly to match the installed network. If you encounter errors or abnormal operation, proceed to Chapter 5, Troubleshooting.

Page 4-12

Page 53
Image 53
Cabletron Systems SEHI-32, SEHI-22 manual On Position Toward Back Epim OFF Position Toward Front, Finishing the Installation