Testing the Installation

3.At the other end of the fiber optic cable, attach the SC connector to the other device.

4.Check that the EPIM-100FX LNK LED is on. If the LED is off, perform the following steps until it is on:

a.Check that the power is turned on for the device at the other end of the link.

b.Verify proper “cross-over” of fiber strands between the applicable port on the SEHI and the fiber optic device at the other end of the fiber optic link segment.

c.Verify that the fiber connection meets the dB loss specifications outlined in Chapter 3.

If a link is not established, contact Cabletron Systems Technical Support.

5.2TESTING THE INSTALLATION

The SEHI00TX-22 is now ready for operation. Before placing the network into service, test that all stations can be addressed and that the SEHI and all stations are indicating normal operation. Ensure that the networking software is configured properly to match the installed network. If there are any errors or abnormal operation, proceed to Chapter 6, Troubleshooting.

SEHI100TX User’s Guide

5-5

Page 36
Image 36
Cabletron Systems SEHI100TX manual Testing the Installation