Carrier 48PG20-28 Unit Start-Upchecklist, I. Pre-Start-Up, Ii.Start-Up, Electrical, Temperatures

Models: 48PG20-28

1 64
Download 64 pages 4.71 Kb
Page 64
Image 64
UNIT START-UP CHECKLIST

UNIT START-UP CHECKLIST

MODEL NO.:___________________________________________

SERIAL NO.:______________________________________________

DATE:_________________________________________________

TECHNICIAN: ____________________________________________

I. PRE-START-UP:

VERIFY THAT ALL PACKING MATERIALS HAVE BEEN REMOVED FROM UNIT

VERIFY INSTALLATION OF OUTDOOR AIR HOOD

VERIFY INSTALLATION OF FLUE EXHAUST AND INLET HOOD

VERIFY THAT CONDENSATE CONNECTION IS INSTALLED PER INSTRUCTIONS

VERIFY THAT ALL ELECTRICAL CONNECTIONS AND TERMINALS ARE TIGHT

VERIFY GAS PRESSURE TO UNIT GAS VALVE IS WITHIN SPECIFIED RANGE

CHECK GAS PIPING FOR LEAKS

CHECK THAT INDOOR-AIR FILTERS ARE CLEAN AND IN PLACE

CHECK THAT OUTDOOR AIR INLET SCREENS ARE IN PLACE

VERIFY THAT UNIT IS LEVEL

CHECK FAN WHEEL AND PROPELLER FOR LOCATION IN HOUSING/ORIFICE, AND VERIFY SETSCREW IS TIGHT

VERIFY THAT FAN SHEAVES ARE ALIGNED AND BELTS ARE PROPERLY TENSIONED

VERIFY THAT SCROLL COMPRESSORS ARE ROTATING IN THE CORRECT DIRECTION

VERIFY INSTALLATION OF THERMOSTAT

￿VERIFY THAT CRANKCASE HEATERS HAVE BEEN ENERGIZED FOR AT LEAST 24 HOURS

II.START-UP

ELECTRICAL

SUPPLY VOLTAGE

 

L1-L2

 

L2-L3

 

 

L3-L1

 

 

COMPRESSOR AMPS — COMPRESSOR A1

L1

 

 

L2

 

L3

 

— COMPRESSOR A2

L1

 

 

L2

 

L3

 

— COMPRESSOR B1

L1

 

 

L2

 

L3

SUPPLY FAN AMPS

 

 

 

 

L1

 

L2

L3

TEMPERATURES

 

 

 

 

 

 

 

 

 

 

 

OUTDOOR-AIR TEMPERATURE

 

F DB (Dry Bulb)

 

 

 

 

RETURN-AIR TEMPERATURE

 

F DB

 

F WB (Wet Bulb)

 

COOLING SUPPLY AIR

 

F

 

 

 

 

GAS HEAT SUPPLY AIR

 

F

 

 

 

 

PRESSURES

 

 

 

 

 

GAS INLET PRESSURE

 

IN. WG

 

 

 

GAS MANIFOLD PRESSURE STAGE NO. 1

 

IN. WG

STAGE NO. 2

 

IN. WG

REFRIGERANT SUCTION CIRCUIT A

 

PSIG

 

 

 

CIRCUIT B

 

PSIG

 

 

 

REFRIGERANT DISCHARGE CIRCUIT A

 

PSIG

 

 

 

CIRCUIT B

 

PSIG

 

 

 

VERIFY REFRIGERANT CHARGE USING CHARGING CHARTS ON PAGE 50

GENERAL￿

ECONOMIZER MINIMUM VENT AND CHANGEOVER SETTINGS TO JOB REQUIREMENTS

Copyright 2005 Carrier Corporation

Manufacturer reserves the right to discontinue, or change at any time, specifications or designs without notice and without incurring obligations.

Book

1

4

PC 111

Catalog No. 534-80211

Printed in U.S.A.

Form 48PG-10SI

Pg CL-1

9-05

Replaces: New

Tab

1a

6a

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -- - - - - - - - - - - - - - - - - - - - CUT ALONG DOTTED LINECUT ALONG DOTTED LINE

Page 64
Image 64
Carrier 48PG20-28 Unit Start-Upchecklist, I. Pre-Start-Up, Ii.Start-Up, Electrical, Temperatures, Pressures, General