
Chapter 1 Overview
Cisco Nexus 5500 Platform Switches
Se n d d o c u m e n t a t i o n c o m m e n t s t o n ex u s 5 k d o c s @ c i s c o . c o m .
Figure 1-22 Components Used to Install the N55 M16UP GEM
1
2
3
4
239328
1 | Status LED | 3 | 16 |
|
|
|
|
2 | Ejector lever | 4 | Captive screw that locks the ejector lever |
|
|
|
|
The ports are numbered the same as with the
Data Ports
Each data port on the Cisco Nexus 5548 switch is numbered, and groups of ports are numbered based on their function. The ports are numbered from top to bottom and left to right.
Figure 1-23 Port Numbering of the Cisco Nexus 5548 Switch with an Expansion Module
1 | 3 | 5 | 7 | 9 | 11 | 13 | 15 | 17 | 19 | 21 | 23 | 25 | 27 | 29 | 31 | 1 | 3 | 5 | 7 | 9 | 11 | 13 | 15 |
2 | 4 | 6 | 8 | 10 | 12 | 14 | 16 | 18 | 20 | 22 | 24 | 26 | 28 | 30 | 32 | 2 | 4 | 6 | 8 | 10 | 12 | 14 | 16 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| 236720 |
1 | 2 |
1
32 fixed ports
2
Power Supplies
The Cisco Nexus 5548 switch uses a
|
| Cisco Nexus 5000 Series Hardware Installation Guide |
|
| |
|
|
| |||
|
|
|
| ||
|
|
|
| ||