Hardware Installation

This section describes the following procedures:

1.T1 Modem Bank power supply installation/replacement

2.T1 Modem Bank standalone or rack installation

3.T1 Modem Bank daisy chaining

4.EPC/X host adapter installation

5.EPC/X host adapter connection to the T1 Modem Bank units.

T1 Modem Bank Power Supply Installation/Replacement

The T1 Modem Bank operates with either a single power supply installed or with two power supplies installed. Dual power supplies allow a T1 Modem Bank to share load balancing so that one power supply can take over if the other power supply becomes inoperable. To install a power supply (or supplies) into a new T1 Modem Bank unit, or to replace or add a power supply in an existing T1 Modem Bank unit, follow the directions in this section. See “Power Supply Removal” on page 73 if you need instructions for removing a power supply from a T1 Modem Bank.

8

T1 Modem Bank

Page 18
Image 18