Installing Download

Cycle the T1 Modem Bank’s power off, then on again to restart POST. After a brief pause, the lights on the display panel will flash, and the T1 Modem Bank will begin the POST sequence, which takes about 2 minutes to complete. Once the POST is completed, P1 will be shown on the display panel to indicate that the T1 Modem Bank is ready for download. (If P1 is not shown, go to the section “POST Failure” on page 30 for instructions.)

P2 indicates that the PING signal has been received; P3 will flash briefly on the screen, indicating that the download has started. P4 indicates that a download is underway. At the same time, the LEDs will blink as packets are counted. The following sequence appears on the display panel: PE, D0, C1, C2, C3, C4. When the download is received and if the checksum has been validated, AC is then shown in the display, indicating that the T1 Modem Bank has been programmed, FEP is running, and the T1 Modem Bank is on-line. At this point, go to either “Software Installation for Novell Systems” on page 34 or “Software Installation for Windows NT Systems” on page 38.

Software Installation

29

Page 39
Image 39
Digi 90031300 manual Installing Download