Emerson 3000 Appendix D, Highlights Of Changes, Effective June, 1994 Rev, Page, Summary

Models: 3000

1 184
Download 184 pages 52.9 Kb
Page 9
Image 9

 

HIGHLIGHTS OF CHANGES

 

APPENDIX D

 

Effective June, 1994 Rev. 2

 

 

Page

Summary

 

 

Page D-1

MPS outline drawing changed to show new MPS.

Page D-2

MPS interior view replaced with new MPS in Figure D-2.

Page D-3

"Optional" for check valve deleted in Figure D-3.

Page D-4

Drawing showing location of optional Z-Purge added as Figure D-4.

Page D-7

Power supply replacement procedures in paragraph D-7 changed to

 

reflect new design in the MPS. Solenoid valve replacement proce-

 

dures in paragraph D-8 changed to reflect new design in the MPS.

Page D-8

Old exploded view of MPS replaced with new MPS.

Page D-10

Paragraph D-11, Adding Probes to the new MPS, added.

Page D-11

Change part numbers for the power supply, solenoid valve, and test

 

gas flowmeter assembly. Add part numbers for reference gas flow-

 

meter assembly and all the parts in the probe adder kit.

 

Effective January, 1995 Rev. 2.1

 

 

Page

Summary

 

 

Page D-1

Updated Figure D-1, MPS 3000 to include hinge.

 

 

 

Effective May, 1996 Rev. 2.2

 

 

Page

Summary

 

 

Page D-11

Updated replacement parts list to reflect new part numbers.

 

 

 

Effective January, 1997 Rev. 2.3

 

 

Page

Summary

 

 

Page D-1

Added warning to read new safety instructions.

Page D-2

Corrected Table D-1 Specifications listing, 1st entry.

Page D-5

Added protective covers and grounds warning.

Page D-7

Added protective covers and grounds warning, corrected item num-

 

ber errors in paragraph D-6.

Page D-11

Added expanded fuse descriptions.

 

 

Page 9
Image 9
Emerson 3000 Appendix D, Highlights Of Changes, Effective June, 1994 Rev, Page, Summary, Effective January, 1995 Rev