Emerson B-106-300NH instruction manual World Class

Models: B-106-300NH

1 182
Download 182 pages 23.73 Kb
Page 57
Image 57

Instruction Manual

World Class 3000

IB-106-300NH Rev. 4.2 July 2002

NOTE

 

Upon completing installation, make sure that the probe is turned on and operating prior to

 

firing up the combustion process. Damage can result from having a cold probe exposed to

2

the process gases.

Power down all probes during outages. Sensor chamber is heated to 736°C. Further, if ducts will be washed down during the outage, remove the probes to prevent water damage.

Rosemount Analytical Inc. A Division of Emerson Process Management

Installation 2-25

Page 57
Image 57
Emerson B-106-300NH instruction manual World Class