World Class 3000

Instruction Manual

Appendix D Rev. 2.4 July 1998

LEGEND FOR FIGURE D-6

1.

Enclosure

23.

Nut

45.

Washer

 

2.

Screw

24.

Lockwasher

46.

Drain Valve

 

3.

Plug

25.

Washer

47.

1/8 in. Impolene Tubing

 

4.

Cable Grip

26.

Washer

48.

Connector

 

5.

Fitting

27.

Screw

49.

Elbow

 

6.

Hose Adapter

28.

Nut

50.

Pressure Regulator

 

7.

Pressure Switch

29.

Washer

51.

Hose Adapter

 

8.

Plug

30.

Washer

52.

1/4 in. Tube

 

9.

Solenoid Valve

31.

Cover Stop Slide

53.

Screw

 

10.

Screw

32.

Screw

54.

Washer

 

11.

Manifold

33.

Washer

55.

Inner Enclosure

 

12.

Washer

34.

Termination Board

56.

Washer

 

13.

Screw

35.

Standoff

57.

Screw

 

14.

Gasket

36.

Mounting Bracket

58.

Power Supply

 

15.

Outer Cover

37.

Cover Plate

59.

Washer

 

16.

Inner Cover

38.

Washer

60.

Nut

D

17.

Flowmeter, 10 SCFH

39.

Screw

61.

Screw

18.

Flowmeter, 2.0 SCFH

40.

Fuseholder

62.

Washer

 

19.

Bracket

41.

Plastic Nut

63.

Solenoid

 

20.

Screw

42.

Bushing

64.

Solenoid

 

21.

Hose Adapter

43.

Pressure Gauge

 

 

 

22.

1/8 in. Hose

44.

Bolt

 

 

 

e. Loosen the retaining ring in the middle of

D-9 PRESSURE REGULATOR MAINTENANCE

 

the solenoid and remove the top part.

 

 

f.

 

a.

Pressure Adjustments

With a spanner wrench or padded pliers,

 

 

 

remove the remaining part of the solenoid

 

Pressure regulator (50, Figure D-6)is fac-

 

from the manifold (11).

 

tory set to 20 psi (138 kPa). Should the

g.

 

 

pressure need to be changed or adjusted,

Separate the new solenoid and screw the

 

use the knob on top of the pressure

 

smaller part into the manifold.

 

regulator.

h.

Place the top part of the solenoid into posi-

b.

Condensation Drain

 

tion and tighten the retaining ring.

 

 

i.

 

 

To drain excess moisture from the internal

Connect the plug to the proper receptacle

 

gas circuit of the MPS, periodically loosen

 

on the termination board (34).

 

drain valve (46) on the bottom of pressure

 

 

 

regulator (50). The moisture will flow

j.

Close and secure the inner cover (16) with

 

through vinyl tubing drain (47) on the bottom

 

two captive screws. Close and secure the

 

of pressure regulator (50) and exit the bot-

 

outer cover (15) with two captive screws.

 

tom of MPS enclosure (1).

Rosemount Analytical Inc. A Division of Emerson Process Management

Appendices D-9

Page 145
Image 145
Emerson B-106-300NH instruction manual Pressure Regulator Maintenance