Xi Advanced Electronics

Instruction Manual

IM-106-910Xi, Original Issue November 2010

Figure 2-7. Flame Safety Interlock - Wiring Diagram

Figure 2-8. Traditional Architecture Cable Gland Assembly

2.Install the cable and lead wires to the probe per manufacturer’s instructions.

3.Install the cable at the probe housing and at the Xi enclosure according to the following procedure:

a.Unscrew locking nut from gland assembly, Figure 2-8, and slide locking nut back along cable.

2-8

Page 28
Image 28
Emerson Process Management IM-106-910Xi instruction manual Flame Safety Interlock Wiring Diagram