Manuals
/
Enterasys Networks
/
Computer Equipment
/
Switch
Enterasys Networks
7G4285-49, 7G4205-72
manual
Figure B-10 Installing the Safety Cover
Models:
7G4285-49
7G4205-72
1
89
96
96
Download
96 pages
38 Kb
86
87
88
89
90
91
92
93
Troubleshooting
Specifications
Install
Connecting to the Network
OFFLINE/RESET Switch
Lanview Diagnostic LEDs
Parameter Setting
How to
What is
Dimm Replacement Procedure
Page 89
Image 89
Gaining Access to Memory Modules
Figure
B-10
Installing the Safety Cover
1
Safety cover
2
Screws (7)
3
Standoff (7)
DFE-Platinum
Series Hardware Installation Guide
B-15
Page 88
Page 90
Page 89
Image 89
Page 88
Page 90
Contents
Enterasys Matrix
Page
Page
Federal Communications Commission FCC Notice
Product Safety
Industry Canada Notice
Class a ITE Notice Clase A. Aviso de ITE
Compatibilidad Electromágnetica EMC
Electromagnetic Compatibility EMC
Elektro- magnetische Kompatibilität EMC
Hazardous Substances
Supplement to Product Instructions
Bsmi EMC Statement Taiwan
Vcci Notice
Declaration of Conformity
Safety Information Class 1 Laser Transceivers
Enterasys NETWORKS, INC. Firmware License Agreement
Viii
Page
Page
Contents
Appendix a Specifications
Figures
Xiv
Who Should Use This Guide
About This Guide
For Refer to
How to Use This Guide
Related Documents
Following conventions are used in this guide
Conventions Used in This Guide
Support@enterasys.com
Getting Help
Overview of DFE-Platinum Series Module Capabilities
Introduction
7G4285-49
DFE Module and Interface Options
7G4285-49 DFE-Platinum Module
7G4205-72
7G4205-72 DFE-Platinum Module
Network Expansion Module NEM
Switch Configuration Using WebView
Connectivity
Management
Standards Compatibility
Switch Configuration Using CLI Commands
Secure Networks Policy Support
Lanview Diagnostic LEDs
Network Requirements
10BASE-T Network
Link Aggregation
1000BASE-T Network
100BASE-TX Network
1000BASE-T Network Network Requirements
Installation
Contents of DFE Module Carton Quantity
Installation Site Requirement
Required Tools
Unpacking the DFE Module
Matrix E7 Chassis Module Placement
Installing an Optional Network Expansion Module NEM
DFE Module Placement and Installation Rules
Example 3 -1, C
Example 1 -1,A
Example 2 -1,B
Example 6 -1, F
Example 4 -1,D
Example 5 -1, E
Preparing to Install into a Chassis
Installing the DFE Modules into a Matrix E7 or N7 Chassis
Preparing to Install into a Chassis
Preparing to Install into a Chassis
Installing the DFE Modules into a Matrix N3 or N5 Chassis
Card guides
Connecting to the Network
Connecting 48 Vdc Power for PoE Operation
Making the UTP Connections
Connecting UTP Cables to DFE Modules
Connecting a Twisted Pair Segment with RJ45 Connector
RX+ TX+
TX1+ 1 RX1- 2 TX2+ 3 TX3+ 4 RX3- 5 RX2- 6 TX4+ 7 RX4
Verifying PoE Port Status
Connecting to an IBM PC or Compatible Device
Connecting to COM Port for Local Management
What Is Needed
Parameter Setting
Connecting to a VT Series Terminal
10 Connecting a VT Series Terminal
Connecting to a Modem
11 Connecting to a Modem
RJ45 DB25
Adapter Wiring and Signal Assignments
COM Port Adapter Wiring and Signal Diagram RJ45
Modem Port Adapter Wiring and Signal Diagram
First-Time Log-In Using a Console Port Connection
Completing the Installation
Completing the Installation of a New System
12 Matrix DFE Startup Screen Example N7 Chassis
Enter
Logging in with an Administratively-Configured User Account
About the Management Mgmt LED
Troubleshooting
Using Lanview
Lanview LEDs on 7G4285-49
Viewing Receive/Transmit Activity on 7G4285-49
Lanview LEDs on 7G4205-72
Viewing Receive/Transmit Activity on 7G4205-72
Viewing the PoE Port Status
Color State Recommended Action
Lanview LEDs
LED
RX/TX
Platinum Series Configuration Guide for
Troubleshooting Checklist
Problem Possible Cause Recommended Action
Troubleshooting Checklist
Overview of DFE Module Shutdown Procedure
OFFLINE/RESET Switch
Recommended Shutdown Procedure Using OFFLINE/RESET Switch
Last Resort Shutdown Procedure Using OFFLINE/RESET Switch
Specifications
Table A-1 7G4285-49 Specifications
DFE Module Specifications
Processors/Memory
Physical
Table A-2 7G4205-72 Specifications
COM Port Pinout Assignments
Table A-3 COM Port Pin Assignments Signal Name Input/Output
Regulatory Compliance
Table A-4 Compliance Standards Regulatory Compliance
Mode Switch Settings and Option Installations
Setting the Mode Switches
Memory Locations and Replacement Procedures
Dram Simm Dimm
Removing the Safety Cover
Gaining Access to Memory Modules
Figure B-3 Removing the Safety Cover
Figure B-4 Removing the Optional Network Expansion Module
Dram Simm Replacement Procedure
Gaining Access to Memory Modules
Removing the Dimm
Figure B-6 Installing the Dimm
Dimm Replacement Procedure
Figure B-7 Removing the Existing Dimm
Figure B-8 Installing the Dimm
Installing the Network Expansion Module NEM
Figure B-9 Installing the Network Expansion Module NEM
Reinstalling the Safety Cover
Figure B-10 Installing the Safety Cover
Page
Overview
About PoE Power over Ethernet
Proprietary PD Detection
Table C-2 PoE Status LED Indications PoE Port Status
PoE Port Status LEDs
Overview About PoE Power over Ethernet
Numerics
Index
NEM B-12 installing
Top
Page
Image
Contents