Execute the showdcl(8) command to check the operation status of the move- destination domain, and then execute the showboards(8) command to check the status of the moved system board.
XSCF> showdcl |
|
| |||
DID | LSB | XSB | Status |
|
|
01 |
|
| Running |
|
|
| 00 |
|
|
| |
| 01 |
|
|
| |
|
|
| |||
|
|
| |||
XSCF> showboards |
|
| |||
XSB | DID(LSB) | Assignment Pwr Conn Conf | Test | Fault |
Assigned | y | y | y | Passed Normal |
4.5Examples: Replacing a System Board
This section provides examples of operations to replace a system board in a domain. The examples illustrate replacement of a system board in a
Note – You cannot use DR to replace a system board in a midrange server because replacing a system board replaces an MBU. To replace a system board in a midrange server, you must turn off the power for all domains, then perform a hardware replacement.