7.Check the status of the move-destination domain and moved system board.

Execute the showdcl(8) command to check the operation status of the move- destination domain, and then execute the showboards(8) command to check the status of the moved system board.

XSCF> showdcl -d 1

 

 

DID

LSB

XSB

Status

 

 

01

 

 

Running

 

 

 

00

01-0

 

 

 

 

01

00-1

 

 

 

 

 

 

 

 

 

XSCF> showboards 00-1

 

 

XSB

DID(LSB)

Assignment Pwr Conn Conf

Test

Fault

-------------------------------------------------------------------

00-1 01(01)

Assigned

y

y

y

Passed Normal

4.5Examples: Replacing a System Board

This section provides examples of operations to replace a system board in a domain. The examples illustrate replacement of a system board in a Uni-XSB environment and a system board in a Quad-XSB environment. In each sample operation, a procedure conforming to Section 4.1.4, “Flow: Replacing a System Board” on page 4-5, is used, and the system board shown in each figure is replaced using the XSCF shell.

Note – You cannot use DR to replace a system board in a midrange server because replacing a system board replaces an MBU. To replace a system board in a midrange server, you must turn off the power for all domains, then perform a hardware replacement.

4-12SPARC Enterprise Mx000 Servers Dynamic Reconfiguration User’s Guide • September 2007