XSCF> showdcl -a

DID LSB XSB Status

00Running

00 00-0

0101-0

0201-1

-------

01Running

0001-2

0101-3

3.Check the status of all related system boards.

Execute the showboards(8) command to display system board information, and then check the status of all system boards related to the PSB to be replaced. The DR operation for replacement may not be possible if the board to be replaced does not support the DR delete operation.

XSCF> showboards -a

 

XSB DID(LSB) Assignment Pwr Conn Conf Test

Fault

-----------------------------------------------------------------

00-0

00(00)

Assigned

y

y

y

Passed

Normal

01-0

00(01)

Assigned

y

y

y

Passed

Normal

01-1

00(02)

Assigned

y

y

y

Passed

Normal

01-2

01(00)

Assigned

y

y

y

Passed

Normal

01-3

01(01)

Assigned

y

y

y

Passed

Normal

4.Delete all system boards related to the CMU to be replaced.

Execute the deleteboard(8) command to delete the system boards, and then assign the boards to a domain that permits the DR operation.

XSCF> deleteboard -c disconnect 01-0 01-1

5. Power off Domain #1 so the CMU can be replaced.

Execute the poweroff(8) command so that the CMU being replaced will not be in use by domain #1.

XSCF> poweroff -d 1

Chapter 4 Practical Examples of DR 4-17