4.1.3Flow: Moving a System Board

FIGURE 4-3Flow: Moving a System Board

Checking operation and selecting

a DR operation

- Operation status and configuration of the move-source domain

-Operation status and configuration of the move-destination domain

-Judgment of whether the DR operation can be performed

 

DR operation

 

 

possible

DR operation not

 

 

 

possible, or domain

Confirmation of the move-source

configuration to be

and move-destination domains

changed

and selecting an operation

 

 

DR operation

DR operation

 

 

possible

not possible

 

DR operation not possible, or domain configuration to be changed

Checking the status of the system

Reserve operation for

board to be moved

 

moving a system board

Checking the device status

 

 

 

DR operation possible

 

 

 

 

 

 

Power-on or restart of

 

 

 

Move operation for the

the move-source domain

system board

 

 

Move processing of the system

 

 

Addition operation for

board

 

 

 

 

the system board in the

Change operation for the move-

 

 

 

 

move-destination domain

source and move-destination

 

 

 

 

 

domain configurations

Status of reserved addition in

 

 

the move-destination domain

4-4SPARC Enterprise Mx000 Servers Dynamic Reconfiguration User’s Guide • September 2007