
Execute the showboards(8) command to display system board information, and then check the status of all related system boards.
XSCF> showboards |
|
XSB DID(LSB) Assignment Pwr Conn Conf Test | Fault |
00(00) | Assigned | y | y | y | Passed | Normal | |
00(01) | Assigned | y | n | n | Passed | Normal | |
00(02) | Assigned | y | n | n | Passed | Normal | |
01(00) | Assigned | y | n | n | Passed | Normal | |
01(01) | Assigned | y | n | n | Passed | Normal |
Execute the replacefru(8) command, then follow the displayed instructions to replace the system board per the Hot Replacement procedure. For information about Hot Replacement, see the SPARC Enterprise M8000/M9000 Servers Service Manual.
XSCF> replacefru
8.Check the status of the replaced system board.Execute the showboards(8) command to display system board information, and then check the status of the system board to be added and confirm its registration in the DCL.
If you need to change the PSB configuration, use the setupfru(8) command. If the system board is not registered in the DCL, register it in the DCL for the target domain by using the setdcl(8) command.
XSCF> showboards |
| |
XSB DID LSB) | Assignment Pwr Conn Conf Test | Fault |
00(00) | Assigned | y | y | y | Passed | Normal | |
00(01) | Assigned | y | n | n | Passed | Normal | |
00(02) | Assigned | y | n | n | Passed | Normal | |
01(00) | Assigned | y | n | n | Passed | Normal | |
01(01) | Assigned | y | n | n | Passed | Normal |