
4.1.4Flow: Replacing a System Board
FIGURE |
|
| ||||||
Stop status | Checking operation and selecting a DR operation | Pooled | ||||||
of the | - | Operation status and configuration of a domain | system | |||||
domain | board | |||||||
- Adjustment between other domains | ||||||||
|
|
|
| |||||
|
|
|
|
|
|
|
| |
|
| - | Configuration of the system board to be | replaced |
|
| ||
|
| - | Checking the device status |
|
|
Deletion reservation
Deletion reservation operation for the system board in its domain
DR deletion
Deletion operation for the system board in its domain
|
|
|
|
| Stop status |
|
|
|
|
|
|
|
| ||
|
|
|
|
| of the domain | There is a domain for | There is no | ||||||||
|
|
|
|
|
|
| |||||||||
|
|
|
|
|
|
| domain for | ||||||||
which deletion has | |||||||||||||||
which deletion | |||||||||||||||
the relevant domain | been reserved. | ||||||||||||||
has been | |||||||||||||||
|
|
|
|
|
|
|
|
|
|
|
|
|
| ||
|
|
|
|
|
|
|
|
|
|
|
|
|
| reserved. | |
|
|
|
|
|
|
|
|
|
|
|
|
|
| ||
|
|
|
|
|
|
|
|
|
|
|
|
| |||
|
|
|
|
|
| Hardware replacement |
| ||||||||
|
|
|
|
|
|
|
|
|
|
|
|
|
| ||
|
|
|
|
|
|
|
|
|
|
|
|
|
| ||
|
|
| Checking operation and selecting a DR operation | ||||||||||||
|
| ||||||||||||||
|
|
| Addition |
| reservation |
|
|
|
|
|
|
| DR addition | ||
|
|
|
|
|
|
|
|
|
|
| |||||
|
| Deletion reservation |
|
|
|
|
| Deletion operation for | |||||||
|
| operation for the system |
|
|
| the system board | |||||||||
|
|
|
|
| |||||||||||
|
| board in its domain |
|
|
|
|
| in its domain |
| ||||||
Start of |
|
|
|
| Start of |
|
|
|
|
|
|
|
| ||
|
|
|
|
|
|
|
|
|
|
|
| ||||
domain |
|
|
|
| domain |
|
|
|
|
|
|
|
| ||
|
|
|
|
|
|
|
|
| |||||||
|
|
|
|
|
|
|
|
|
|
|
| ||||
|
|
|
|
| State of the domain | ||||||||||
relevant domain |
|
|
|
|
|
| in operation | ||||||||
|
|
|
|
|
Chapter 4 Practical Examples of DR