Back

Installation Manual COLOR SCANNING SONAR FSV-24/24S

SAFETY INSTRUCTIONS

i

SYSTEM CONFIGURATION

iii

EQUIPMENT LISTS

v

1.

MOUNTING THE EQUIPMENT

1-1

1.1

Mounting the Hull Unit

1-1

1.2

Mounting the Display Unit

1-8

1.3

Mounting the Transceiver Unit

1-14

1.4

Mounting the Power Supply Unit

1-14

1.5

Grounding the Equipment

1-15

1.6

Installing Attachment Flange (option)

1-15

1.7

Mounting the Cable for Extension Kit (option)

1-18

1.8 Attachment Kit (option)

1-19

2.

WIRING

2-1

2.1

How to Use the Crimping Tool, Pin Extractor

2-1

2.2

Location of Connectors

2-2

2.3

Monitor Unit

2-4

2.4

Processor Unit

2-8

2.5

Transceiver Unit

2-14

2.6

Power Supply Unit

2-17

2.7

Cable for Extension Kit

2-17

3.

ADJUSTMENT AND CHECK

3-1

3.1

Hull Unit Check

3-1

3.2

Heading Adjustment

3-4

3.3

Configuring Own Ship Mark

3-6

3.4 Other SYSTEM Menu Items

3-8

3.5

CONE Board Setting in the Processor Unit

3-12

3.6

DIP Switch Setting

3-13

3.7

Testing TX/RX Independently at hull unit

3-15

4. CONNECTING THE EXTERNAL INTERFACE CS-120A

4-1

Check List

AP-1

PACKING LISTS

A-1

OUTLINE DRAWINGS

D-1

INTERCONNECTION DIAGRAMS

S-1

www.furuno.co.jp

Page 1
Image 1
Furuno FSV-24S installation manual Iii, Check List