Furuno FSV-24S installation manual Check List

Models: FSV-24 FSV-24S

1 104
Download 104 pages 3.07 Kb
Page 68
Image 68

Check List

Ship Name

Date

/

/

Location

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

SCANNING

 

TYPE

FSV-24

 

 

 

 

 

RESULT

 

SONAR

 

 

 

 

 

 

 

 

 

 

S/N

 

 

Monitor unit (FSV-2400)

 

 

Options

 

 

 

 

 

 

Control unit (FSV-2401)

 

 

CS-120A

 

 

 

 

 

 

Processor unit (FSV-2402)

 

 

VI-1100A

 

 

 

 

 

 

Transceiver unit (FSV-241E)

 

 

CS-170

 

 

 

 

 

 

Power supply unit (FSV-242)

 

 

FSV-2451(5m),FSV2452(15m)

 

 

 

 

Hull unit (FSV-243E/244E )

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Reference

 

 

 

 

 

 

 

 

 

 

Frequency

 

24KHz

 

 

 

 

 

 

 

 

Transducer location

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Note:

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

NO

CHECK ITEMS

 

CONTENT

 

 

RESULT

DATA

1

Unit installation

All units are installed according to installation

Good/No Good

 

 

 

 

 

manual.

 

 

 

 

 

 

 

2

Grounding

Copper plate should be connected for the

Good/No Good

Sheet 1

 

 

 

 

following units.

 

 

 

 

 

 

 

 

 

 

1.Power supply unit

 

 

 

 

 

 

 

 

 

 

2.Transceiver unit

 

 

 

 

 

 

 

 

 

 

3.Junction box(Option)

 

 

 

 

 

 

 

 

 

IV-8sq is connected for the following units.

 

 

 

 

 

 

 

1.Raise/lower box

 

 

 

 

 

 

 

 

 

 

2.Processor unit

 

 

 

 

 

 

 

 

 

 

3.Monitor unit

 

 

 

 

 

 

3

Connection

Check the connection between each unit.

Good/No Good

Sheet 1

 

 

 

 

1.Transducer-Transceiver unit

 

 

 

 

 

 

 

 

2.Transceiver unit-Processor unit

 

 

 

 

 

 

 

 

3.Processor unit-Monitor unit

 

 

 

 

 

 

 

 

4.Monitor unit-Control unit

 

 

 

 

 

 

 

 

 

5.Processor unit- Other equipments

 

 

 

 

 

 

 

6.Ship’s mains-Power supply unit

 

 

 

 

 

 

 

 

7.Ship’s mains-Hull unit

 

 

 

 

 

 

 

 

 

8.Ship’s mains-Processor unit

 

 

 

 

4

Power Supply

Check ship’s mains voltage for following units.

Good/No Good

Sheet 1

 

(Ship’s mains)

1.Power supply unit

 

 

 

 

 

 

 

 

 

 

2.Raise/lower motor line

 

 

 

 

 

 

 

 

 

Check whether led of phase detector is light or

 

 

 

 

 

 

 

not.

 

 

 

 

 

 

 

 

 

 

 

The 3 phase line must be changed if led is light.

 

 

 

 

 

 

 

3.Processor unit

 

 

 

 

 

 

5

Output power

Check output power and +B voltage.

Good/No Good

Fig1

6

Test

 

Check the following tests.

 

 

Good/No Good

Sheet2

 

 

 

 

Board test/Panel test/RX test/Channel

 

 

Installation

 

 

 

 

test1/Channel test2/Noise test

 

 

 

manual

7

Setting

 

Check the user program setting.

 

 

 

Sheet3

8

Operation check

Check pictures after turning on the power.

Good/No Good

 

AP-1

Page 68
Image 68
Furuno FSV-24S installation manual Check List