Furuno FSV-24S installation manual Off

Models: FSV-24 FSV-24S

1 104
Download 104 pages 3.07 Kb
Page 51
Image 51

How to check the hull unit

1.Press the POWER () switch on the control unit (for the display unit) to turn on

the equipment. Confirm that the lamps above the ON and switches light.

Transducer switches

2.Confirm that the 5V and UP lamps on the raise/lower control box are lit.

3.Remove the cover of the raise/lower control box and use a multimeter to measure the following voltages:

Terminal

Terminal No.

 

Voltage

TB-C101

(1) – (2), (6)

–(7)

220 VAC

 

(2) – (3), (7)

– (8)

220 VAC

 

(1) – (3), (6)

–(8)

220 VAC

4.In the raise/lower control box, set the TEST/NORMAL switch to TEST. Press the [DOWN] switch to confirm that the transducer lowers. Also, while the transducer is being lowered, check that the MD LED lights when the MD L. SW kicks. Note that the MD L. SW does not stop the transducer when the TEST/NORMAL switch is in the TEST position.

TEST

 

OFF

 

5V

NORMAL

 

L.SW

 

UP

MD

DN

UP

DOWN

Control unit (for the hull unit)

5.Press and release [DOWN] switch. Confirm that the transducer stops at the moment the switch is released.

6.Press the [DOWN] switch again. Confirm that the transducer stops at the moment the lower limit switch kick.

7.Confirm that the [UP] switch operators in a similar manner.

3-3

Page 51
Image 51
Furuno FSV-24S installation manual Off