1.5Grounding the Equipment

The power supply unit, processor unit and hull unit have protective grounding. Ground the units with a ground wire (IV-8SQ, local supply) or copper strap to prevent electrical shock. Ground the monitor unit and transceiver unit with a ground wire (IV-8SQ, local supply) or copper strap fastened to the ship’s superstructure. For the power supply unit, transceiver unit and junction box (option) use a supplied copper strap.

Grounding for junction box

Use one of four butterfly bolts to ground the junction box.

1.6Installing Attachment Flange (option)

The tank for the CSH-20 series may be used by installing the optional attachment flange.

In case that 1200 mm stroke was used in CSH-20 series

Attachment flange set

For FSV-247: OP10-22 (Code no: 000-067-037)

Name

Type

Code No.

Attachment flange

10-077-5801

100-303-601

O-ring

CO 0318A (V585)

000-166-370-10

Hex. bolt

M20x120 SUS304

000-162-825-10

Hex. nut

M20 SUS304

000-863-116

Flat washer

M20 SUS304

000-864-136

Spring washer

M20 SUS304

000-864-270

In case that 1600 mm stroke was used in CSH-20 series

Attachment flange set

For FSV-248: OP10-23 (Code no. 000-067-038)

Name

Type

Code No.

Attachment flange

10-077-5802

100-303-610

O-ring

CO 0318A (V585)

000-166-370-10

Hex. nut

M20 SUS304

000-863-116

Flat washer

M20 SUS304

000-864-136

Spring washer

M20 SUS304

000-864-270

Q’ty

Remarks

1

 

1

 

24

 

48

 

48

 

24

 

Q’ty

Remarks

1

 

1

 

48

 

24

 

24

 

1-15

Page 23
Image 23
Furuno FSV-24S installation manual Grounding the Equipment