2.4Processor Unit

Cables (10S2074, 10S1258-1 and control cable) from the various units are connected to the CONE Board (10P6905) via the cable clamp (See page 2-2).

CAUTION

Divide cables attached to the back of the processor unit between right and left side. And then tie each group with a cable tie at the position 150 mm from connectors.

This is necessary to prevent cable stress.

15cm

Cable tie

2.4.110S1258-1 cable

This cable runs between the processor unit and transceiver unit.

 

SHIELD

ANTICORROSIVE SHEATH

 

 

 

 

 

 

 

 

 

19

8

9

 

 

1. BLK

9. BLK/GRY

17. BRN/GRY

 

10

 

2. BLK/BRN

10. BLK/WHT

18. BRN/WHT

18

7

2

3

 

3. BLK/RED

11. BRN/RED

19. RED/ORG

11

 

17

6

1

4

12

 

4. BLK/ORG

12. BRN/ORG

 

5

 

5. BLK/YEL

13. BRN/YEL

 

 

 

13

 

6. BLK/GRN

14. BRN/GRN

 

 

 

 

 

 

16 15 14

 

 

 

 

 

 

 

 

ARMOR

7. BLK/BLU

15. BRN/BLU

 

 

 

 

 

 

8. BLK/PPL

16. BRN/PPL

 

 

 

 

 

 

 

 

1:Coaxial cable

2 to 19: Twisted pair cable

Cable type 10S1258-1, sectional view

2-8

Page 36
Image 36
Furuno FSV-24S installation manual Processor Unit, 1 10S1258-1 cable