Setting up the server

Use the instructions in the Gateway 7450R Rackmount Installation Guide that came with the server to assemble the server.

You should prepare a safe working environment before assembling the server by following these guidelines:

Important Keep the boxes and packing material. If you need to send the server to Gateway for repairs, you must use the original packaging or your warranty may be voided.

Obtain an adequately rated uninterruptible power supply (UPS). A UPS protects against AC line spikes, power interruptions, and other power fluctuations that may damage the server.

Protect the server from extreme temperature and humidity. Do not expose it to direct sunlight, heater ducts, or other heat-generating objects.

Route external cables carefully to make sure they do not block air vents or impede airflow.

Make sure that the inlet air temperature within the rack cabinet remains below the specified limit of 40° C (104° F).

Keep the server away from equipment that generates magnetic fields, such as unshielded stereo speakers. Even a telephone placed too close to the server may cause interference.