-18- Model G0740 (Mfg. Since 11/12)
SECTION 3: SETuP
Your machine was carefully packaged for safe
transportation. Remove the packaging materials
from around your machine and inspect it. If you
discover any damage, please call us immediately
at (570) 546-9663
for advice.
Save the containers and all packing materials for
possible inspection by the carrier or its agent.
Otherwise, filing a freight claim can be difficult.
When you are completely satisfied with the condi
-
tion of your shipment, inventory the contents.
unpacking
the list below outlines the basic process of pre-
paring your machine for operation. specific steps
are covered later in this section.
The typical preparation process is as follows:
1. unpack the lathe and inventory the contents
of the box/crate.
2. Clean the lathe and its components.
3. identify an acceptable location for the lathe
and move it to that location.
4. level the lathe and either bolt it to the floor or
place it on leveling pads.
5. assemble the loose components and make
any necessary adjustments or inspections to
ensure the lathe is ready for operation.
6. Check/lubricate the lathe.
7. Connect the lathe to the power source.
8. test run lathe to ensure it functions properly.
9. perform the spindle break-in procedure to
prepare the lathe for operation.
Preparation
the following are needed to complete the setup
process, but are not included with your machine.
for Lifting and Moving:
a forklift or other power lifting device rated
for at least 3500 lbs.
two lifting straps rated for at least 3500 lbs.
each
guide rods for steading the load when lift-
ing (see Page 22)
two other people for moving machine
—hardwood blocks (see Page 22)
for Power Connection:
a power source that meets the minimum cir-
cuit requirements for this machine (review
Power Supply on Page 15 for details)
an electrician or qualified service person-
nel to ensure a safe and code-compliant
connection to the power source
for Assembly:
shop rags
Cleaner/degreaser (see Page 20)
Quality metal protectant lubricant
safety glasses for each person
Wrench or socket 21mm
Wrench or socket 19mm
Floor mounting hardware as needed (see
Page 24)
precision level at least 12" long
Needed for Setup