Henny Penny EEG-144, EEG-142, EEG-141, EEG-143 Preventive Maintenance Schedule, ProcedureFrequency

Models: EEG-143 EEG-144 EEG-141 EEG-142

1 72
Download 72 pages 1.4 Kb
Page 46
Image 46
3-21. PREVENTIVE MAINTENANCE SCHEDULE

3-21. PREVENTIVE MAINTENANCE SCHEDULE

3-25

Model EEG-141, 142, 143, 144

As in all food service equipment, the Henny Penny open fryer does require care and proper maintenance. The table below provides a summary of scheduled maintenance procedures to be performed by the operator.

ProcedureFrequency

Filtering of shortening

Daily

(Section 3-11)

 

Changing the filter pad

Daily

(Section 3-13)

 

Lubricate filter pan o-rings

Every filter pad change

Lubricate EEG-141 oil reservoir

When reservoir is

o-rings

removed

Changing of oil

When oil smokes,

 

foams up violently, or

 

tastes bad

Cleaning the vat

Every change of oil

(Section 3-15)

 

Inspect filter pan o-rings

Quarterly

(Section 3-16)

 

Inspect EEG-141 reservoir

Quarterly

o-rings (Section 3-10)

 

Clean blower & vents

Semi-Annually

(Section 3-21)

 

609

Page 46
Image 46
Henny Penny EEG-144, EEG-142, EEG-141, EEG-143 warranty Preventive Maintenance Schedule, ProcedureFrequency