HP OpenView Storage B6960-96008 Running Session, Aborting an SAP R/3 Backup Session, 198

Models: OpenView Storage B6960-96008

1 396
Download 396 pages 29.22 Kb
Page 220
Image 220

 

Integrating SAP R/3 and Data Protector

 

Backing Up an SAP R/3 Database

 

To start an incremental backup, specify Incremental mode in the Data

 

Protector GUI or incr mode in the CLI, as follows:

 

omnib -sap_list <SAP_Backup_Specification> -barmode incr

 

 

NOTE

It is not possible to perform an incremental backup in backint mode.

 

 

Aborting a

In the Actions menu, click Abort to abort a running SAP R/3 backup

Running Session

session, and then confirm the action.

Figure 2-13

Aborting an SAP R/3 Backup Session

Scheduling a Backup

For more information on scheduling, refer to the online Help index keyword “scheduled backups”.

198

Chapter 2

Page 220
Image 220
HP OpenView Storage B6960-96008 manual Running Session, Aborting an SAP R/3 Backup Session, 198