Table of contents
1 | Safety precautions |
|
| General safety guidelines | 1 |
| Electric shock hazard | 1 |
| Heat hazard | 2 |
| Fire hazard | 2 |
| Mechanical hazard | 2 |
| Heavy substrate hazard | 3 |
| Ink handling | 3 |
| Warning and Cautions | 3 |
| Warning labels | 3 |
| Emergency stop buttons | 5 |
2 | Introduction |
|
| Installation guide overview | 6 |
| Manpower required | 6 |
| Tools required for installation | 6 |
| Inbox content | 7 |
3 Receive the shipment |
| |
| Unload the crate | 9 |
| Move the printer over ramps | 10 |
| Remove the crate packaging | 10 |
| Remove the printer from the pallet | 11 |
| Lift the printer to a second floor using a crane | 13 |
4 | Set up the printer in the final position |
|
| How to push the printer | 15 |
| Choose the final position | 15 |
| Remove additional packaging | 17 |
| Lower the feet | 22 |
5 Connect the power cables |
| |
| Requirements | 23 |
ENWW | iii |