HP Scitex LX800 Industrial manual Connect the power cables, Requirements, Tri-phase AC Power Cord

Models: Scitex LX800 Industrial

1 86
Download 86 pages 33.97 Kb
Page 27
Image 27

5 Connect the power cables

Requirements

An electrician is required for the setup and configuration and building of the electrical system used to power the printer and also for printer installation. Make sure that your electrician is appropriately certified according to local regulations and supplied with all the information regarding the electrical configuration.

Configure the building's electrical system used to power the printer to meet the printer's requirements and the Electrical Code requirements of the local jurisdiction of the country where the equipment is installed. A qualified electrician is required.

Your printer requires the following electrical components to be supplied and installed by the customer, according to the Electrical Code requirements of the local jurisdiction of the country where the equipment is installed.

Remember that you are required to follow the local laws, regulations, and standards that pertain to the electrical installation of your printer.

Tri-phase AC Power Cord

The cable must meet the requirements of the printer and should be in accordance with the Electrical Code requirements of the local jurisdiction of the country where the equipment is installed.

Printer's tri-phase line specifications

High-voltage systems

Low-voltage systems

 

 

 

Input voltage (line to line)

3 x 380–414 V~ (-10% +6%)

3 x 200–220 V~ (±10%)

 

 

 

Input frequency

50 Hz

60 Hz (1)

 

 

 

Power Consumption

15 KW

15 KW

 

 

 

Maximum Load Current

30 A

50 A

1Japan may have input frequencies of 50 Hz or 60 Hz

Power Cord Specification

High-voltage systems

High-voltage systems

 

 

 

Configuration

4 Wires, L1/L2/L3/PE

 

 

 

 

Minimum cross-sectional area

AWG6, 16mm2

AWG6

The power cord must enter into the printer through the AC power gland, and securely fit into it, in order to avoid any slip even when the cord suffers a pull force of 100N.

ENWW

Requirements 23

Page 27
Image 27
HP Scitex LX800 Industrial manual Connect the power cables, Requirements, Tri-phase AC Power Cord