Invacare Ranger IIBASIC C R O S, S B R A C E S, Pivot Link, Locknut STEPS 4, Wheelchair Frame

Models: Ranger IISTANDARD

1 84
Download 84 pages 3.62 Kb
Page 38
Image 38
C R O S

PROCEDURE 11

CROSSBRACES

C R O S

MWD WHEELCHAIRS -

A.Reinstall the battery tray onto the wheelchair. Re- fertoINSTALLING/REMOVINGBATTERYTRAY in PROCEDURE 14 of this manual.

B.Reinstall the battery boxes onto the wheelchair. INSTALLING/REMOVING BATTERY BOXES in PROCEDURE 14 of this manual.

19.If necessary, reinstall the shrouds. Refer to REMOV- ING/INSTALLING SHROUDSin PROCEDURE 10 of this manual.

S B R A C E S

 

Locknut

Crossbrace

Hex Bolt

(STEPS

 

(STEPS

7, 12)

 

4, 13)

 

 

Locknut

(STEPS 4, 13)

Pivot Link

 

Locknut (STEPS 4, 13)

Hex Bolts (STEPS 4, 13)

 

Tie Wraps (STEPS 6, 14)

Wheelchair Frame

Washer (STEPS 7, 12)

Hex Bolts (STEPS 7, 12)

Black Dust Cover (STEPS 5, 15)

Pivot Tube Plug Pin (STEPS 9, 10)

DETAIL "B" - FWD WHEELCHAIRS

RIGHT

ONLY

LEFT

NOTE: Right and left is determined by sit- ting in the wheelchair.

DETAIL "A" - (STEPS 8, 11)

 

MWD WHEELCHAIRS

FWD WHEELCHAIRS

Front ofFront of Wheelchair
Wheelchair

 

Note orientation of hex bolt, washers, coved washers and locknut for installation of new crossbraces.

FIGURE 1 - ADJUSTING SEAT WIDTH - INTEGRATED SLING SEAT S

38

Page 38
Image 38
Invacare Ranger IIBASIC C R O S, S B R A C E S, Pivot Link, Locknut STEPS 4, Wheelchair Frame, Right, Only, Left