OPERATION OF THE SYSTEM

OPERATION OF THE SYSTEM

WTC 600 LP / MP

3 Operation of the System

3.1Assembly and Starting Operation

Assembly

Chapter

 

 

Checking the scope of delivery (delivery note)

 

 

 

Placing the equipment in the set-up location and positioning

 

 

 

Connecting the untreated water to the WTC 600 LP/MP; connecting

2.2, 3.3.2.1, 3.3.1

the WTC 600 PI in between, if required (depending on delivery scope)

 

 

 

Installing the piping for backwashing and drinking water

2.2

 

 

Installing the float switch

3.3.2.4

 

 

Filling and connecting the sand filter and the activated carbon filter

3.4.2

 

 

Connecting the electrical system

SLP, 3.3.2

 

 

 

Table 8

Assembly work to be carried out upon starting operation

 

Starting Operation

Chapter

 

 

Establishing the untreated water supply

2.2

 

 

Manually actuating the sand filter backwashing

3.4.2

 

 

Manually actuating the activated carbon filter backwashing

3.4.2

 

 

Flushing the reverse osmosis

3.4.3.7

 

 

Filling the chemicals container

3.2

 

 

Adjusting the flow rates

3.4.3.8

 

 

Filling out the metering table in the operating instructions

 

 

 

 

 

Instructing the operator (operating instructions)

 

 

 

 

Table 9

Overview of start-up work

 

A water analysis with the following values must exist for commissioning of the WTC 600:

-Total hardness GH in °dH

-Iron Fe in mg/l

-Manganese Mn in mg/l

-Ammonium NH4 or NH3 in mg/l

-System yield determined by the sales department (Normal case: 75%, in special cases 50%).

20

Service Handbook 08.2004

Page 20
Image 20