OPERATION OF THE SYSTEM | WTC 600 LP / MP |
3.3.2.4Float Switch
Connect the signal lines of the enclosed float switch to clamps 6/7 (8S3 option) of the connecting terminal – compare wiring diagram in the switching box. Upon installation, adjust a switching hysteresis of at least 300 liters between the
3.3.2.5Reverse Osmosis System
The WTC 600 LP/MP is connected to the following power supply:
-400 V / 50Hz, 3Ph + N + PE or 230 V / 50Hz, 1Ph + N + PE (depending on type of system)
-Fuse protection 16 A
-RC protective switch 30 mA from source of power supply (check if in existence or have confirmed in writing).
3.4Starting Operation
Operation of the individual equipment components is started in the following sequence:
-Fill the preliminary filter and start operation by backwashing (3.4.2)
-
-Fill metering container and start operation (3.4.1)
-Start the operation of the reverse osmosis (3.4.3.8)
3.4.1Metering Station
NOTE Pushbutton for venting in “continuous operation” (14/3).
Operating mode on “Manual” (14/2)! Change the operating mode by pressing the "Mode" key (14/2).
Modul | Lift | Frequency Meter- | |
| (14/1) | (14/4) | ing |
|
|
|
|
Pre- |
|
|
|
chlorination | 40% | 70% | 3.2.2 |
|
|
|
|
Antiscalant | 40% | 50% | 3.2.3 |
|
|
|
|
Post |
|
|
|
clorination | 40% | 70% | 3.2.4 |
|
|
|
|
Flocculation | 40% | 70% | 3.2.5 |
|
|
|
|
Table 14 Checking pump settings
NOTE | Adjust the lift only when the |
| pump is running. Danger of |
| damaging! |
43
1
2
Figure 14 Metering station
30 | Service Handbook 08.2004 |